- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Municipal Corporation Aurangabad
- >
NTID 39821856
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Providing Drainage Line Near S, Aurangabad-MH - Tender Details
Municipal Corporation Aurangabad
Aurangabad-MH, Maharashtra, India
NTID 39821856
- Opening Date : Thu 3rd April, 2025
- Closing Date : Tue 1st April, 2025
- ₹ 627485.00
- NTID 39821856
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 20 | Total Qty : 901.59
# | Item | Quantity | Units |
---|---|---|---|
1 | Removing Existing Paving Blocks and stacking as per instructed by engineer in charge. (SSR No. Sanctioned Rate) | 60.00 | No. |
2 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. (SSR No. 46.13) | 12.00 | No. |
3 | Excavation for Trenches in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) (SSR No. Section E Particular No - 1) | 115.20 | No. |
4 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge. normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete.(Bd-A-3/259) Lift 0 to 1 .5 M (SSR No. Section E Particular No - 3) | 38.40 | No. |
5 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. ( Bd-A-4/259) Lift 0 to 1 .5 M (SSR No. Section E Particular No - 5) | 12.80 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054