Providing Design And Consultancy Services For Civil Works For Capacity Expansion Project Phase Ii For Dabg, Heep, Haridwar

Tendering Authority: Bharat Heavy Electricals Limited

India, Uttarakhand, Haridwar

NTID

29826769

Last Date For Submission

06 Dec, 2022

Closing Date

06 Dec, 2022

BOQ Items Total Items : 9 | Total Qty : 9
# Item Quantity Units
1 PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF,PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF, (I) TWO PRE-ENGINEERED BUILDING (PEB) STEEL STRUCTURE WORKSHOPS BAYS (MACHINE BAY AND ASSEMBLY BAY), EACH HAVING PLAN AREA OF 108 M X 24 M AND 12 TO 16M CLEAR CEILING HEIGHT, EACH BAY CARRYING TWO NOS. OF EOT CRANES OF 30 MT AND 5 MT CAPACITY. CONFIRMING TO BEST GREEN BUILDING CONCEPT AND AESTHETIC APPEARANCE. (II) OFFICE BUILDINGS (UP TO G+1), HAVING 650M2 APPROX., EQUIPMENT & AUXILIARY BUILDINGS ADJOINING / IN THE VICINITY OF BAYS WITH TOTAL COVERED AREA 2350M2 APPROX. (III) OTHER INFRASTRUCTURES LIKE ROADS, APPROACHES, FRESH/INDUSTRIAL WATER LINES, DRAINAGE, SEWERAGE, LANDSCAPING, PARKING, GROUNDWATER RECHARGE ETC. ALONG WITH MODIFICATION & INTEGRATION OF EXISTING INFRASTRUCTURES LIKE ADMIN BUILDING, WORKSHOP BAYS ETC. WITH NEW PROPOSED BUILDINGS AND WORKSHOP BAYS. (IV) THE EXPANSION PROJECT IS TO BE DESIGNED AND EXECUTED AS PER BHEL APPROVED GREEN BUILDING NORMS. FOR ABOVE MENTIONED PROJECT- DELIBERATIONS WITH BHEL FOR PREPARATION, SUBMISSION OF MASTER PLAN, DPR ETC AND GETTING ITS APPROVAL BY BHEL. THE MASTER PLAN DPR TO COVER EXISTING AND PROPOSED INFRASTRUCTURE LIKE OFFICE /STORES/FACILITY/ AHU/PLANT ROOMS INCLUDING THE ROADS, APPROACHES, TOILETS AND OTHER REQUIRED AMENITIES, DRAINAGE, SEWERAGE, HORTICULTURE & LANDSCAPING, PARKING, FRESH /INDUSTRIAL. / FIRE HYDRANT WATER LINES AND RECYCLING SYSTEM, STREET LIGHTING, GROUND WATER RECHARGE STORAGE & RECYCLE SYSTEM, WASTE MANAGEMENT SYSTEM ETC. COMPLETE, ARCHITECTURAL AND STRUCTURAL FRAMING PLANS AND ELEVATIONS OF ALL THE CIVIL WORKS BUILDINGS AND STEEL STRUCTURE SHEDS. PROVIDING PRELIMINARY ESTIMATED COSTS OF TOTAL WORKS AND SUMMARY OF COSTS OF DIFFERENT COMPONENTS OF ENTIRE WORKS. THE PLANS PROPOSED HAVE TO BE TO BE IN LINE WITH BEST GREEN BUILDING CERTIFICATION REQUIREMENTS. 1 NO
2 PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF,PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF, (I) TWO PRE-ENGINEERED BUILDING (PEB) STEEL STRUCTURE WORKSHOPS BAYS (MACHINE BAY AND ASSEMBLY BAY), EACH HAVING PLAN AREA OF 108 M X 24 M AND 12 TO 16M CLEAR CEILING HEIGHT, EACH BAY CARRYING TWO NOS. OF EOT CRANES OF 30 MT AND 5 MT CAPACITY. CONFIRMING TO BEST GREEN BUILDING CONCEPT AND AESTHETIC APPEARANCE. (II) OFFICE BUILDINGS (UP TO G+1), HAVING 650M2 APPROX., EQUIPMENT & AUXILIARY BUILDINGS ADJOINING / IN THE VICINITY OF BAYS WITH TOTAL COVERED AREA 2350M2 APPROX. (III) OTHER INFRASTRUCTURES LIKE ROADS, APPROACHES, FRESH/INDUSTRIAL WATER LINES, DRAINAGE, SEWERAGE, LANDSCAPING, PARKING, GROUNDWATER RECHARGE ETC. ALONG WITH MODIFICATION & INTEGRATION OF EXISTING INFRASTRUCTURES LIKE ADMIN BUILDING, WORKSHOP BAYS ETC. WITH NEW PROPOSED BUILDINGS AND WORKSHOP BAYS. (IV) THE EXPANSION PROJECT IS TO BE DESIGNED AND EXECUTED AS PER BHEL APPROVED GREEN BUILDING NORMS. FOR ABOVE MENTIONED PROJECT- PREPARATION AND SUBMISSION OF TENDER DOCUMENT/S FOR FLOATING TENDER FOR EXECUTION IN ONE OR MORE TENDERS AS DECIDED BY BHEL. TENDER DOCUMENTS TO INCLUDE NIT, PQR, DETAILED ESTIMATE OF ENTIRE WORKS (CIVIL WORKS AND STEEL STRUCTURE WORKS), BOQS, ITEMS WITH ITS SPECIFICATIONS, RATES OF BOQ ITEMS WITH ITS ANALYSIS, FIELD QUALITY PLANS FOR EXCUTION OF WORKS, ESTIMATED OPTIMUM EXECUTION PLAN OF ENTIRE WORKS AND DIFFERENT COMPONENTS OF PROJECT, TECHNICAL, COMMERCIAL AND GENERAL TERMS AND CONDITIONS OF CONTRACT, INCORPORATE STANDARD TERMS AND CONDITIONS ETC. SPECIFIED BY BHEL RELATING TO SUCH TENDERS, ALSO INCLUDING ABSTRACT OF CEMENT AND STEEL (TMT AND STRUCTURAL) REQUIREMENTS TO EXECUTING AGENCY/AGENCIES. THE ESTIMATES, SPECIFICATIONS AND EXECUTION PLANS TO BE OPTIMISED W.R.T. COST AND SPEEDY EXECUTION WITH APPROPRIATE PENALTY/LD CLAUSE COVERING REQUIREMENTS OF CONFIRMING TO BHEL APPROVED GREEN BUILDING PROJECT. DULY SIGNED AND STAMPED TENDER DOCUMENTS SHALL BE SUBMITTED BY THE CONSULTANT AND GOT APPROVED BY BHEL. PROVIDING REQUIRED INPUTS /AMENDMENTS IN DOCUMENTS TILL PRE/POST AWARD OF TENDER, IF ANY. SUPPORT TO BHEL IN ASSESSMENT OF BIDDERS IN THE TENDER/S AS SOUGHT BY BHEL IN WRITING. 1 NO
3 PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF,PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF, (I) TWO PRE-ENGINEERED BUILDING (PEB) STEEL STRUCTURE WORKSHOPS BAYS (MACHINE BAY AND ASSEMBLY BAY), EACH HAVING PLAN AREA OF 108 M X 24 M AND 12 TO 16M CLEAR CEILING HEIGHT, EACH BAY CARRYING TWO NOS. OF EOT CRANES OF 30 MT AND 5 MT CAPACITY. CONFIRMING TO BEST GREEN BUILDING CONCEPT AND AESTHETIC APPEARANCE. (II) OFFICE BUILDINGS (UP TO G+1), HAVING 650M2 APPROX., EQUIPMENT & AUXILIARY BUILDINGS ADJOINING / IN THE VICINITY OF BAYS WITH TOTAL COVERED AREA 2350M2 APPROX. (III) OTHER INFRASTRUCTURES LIKE ROADS, APPROACHES, FRESH/INDUSTRIAL WATER LINES, DRAINAGE, SEWERAGE, LANDSCAPING, PARKING, GROUNDWATER RECHARGE ETC. ALONG WITH MODIFICATION & INTEGRATION OF EXISTING INFRASTRUCTURES LIKE ADMIN BUILDING, WORKSHOP BAYS ETC. WITH NEW PROPOSED BUILDINGS AND WORKSHOP BAYS. (IV) THE EXPANSION PROJECT IS TO BE DESIGNED AND EXECUTED AS PER BHEL APPROVED GREEN BUILDING NORMS. FOR ABOVE MENTIONED PROJECT-APPLICATION TO IGBC OR APPROPRIATE AGENCY FOR BEST GREEN BUILDING CERTIFICATION IN TIME WITH REQUIRED DOCUMENTS AND ARRANGING REQUIRED VISITS / AUDITS ETC. COMPLETE TO ENABLE OBTAIN FINAL CERTIFICATION OF THE PROJECT AS PER BHEL APPROVED GREEN BUILDING NORMS. 1 NO
4 PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF,PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF, (I) TWO PRE-ENGINEERED BUILDING (PEB) STEEL STRUCTURE WORKSHOPS BAYS (MACHINE BAY AND ASSEMBLY BAY), EACH HAVING PLAN AREA OF 108 M X 24 M AND 12 TO 16M CLEAR CEILING HEIGHT, EACH BAY CARRYING TWO NOS. OF EOT CRANES OF 30 MT AND 5 MT CAPACITY. CONFIRMING TO BEST GREEN BUILDING CONCEPT AND AESTHETIC APPEARANCE. (II) OFFICE BUILDINGS (UP TO G+1), HAVING 650M2 APPROX., EQUIPMENT & AUXILIARY BUILDINGS ADJOINING / IN THE VICINITY OF BAYS WITH TOTAL COVERED AREA 2350M2 APPROX. (III) OTHER INFRASTRUCTURES LIKE ROADS, APPROACHES, FRESH/INDUSTRIAL WATER LINES, DRAINAGE, SEWERAGE, LANDSCAPING, PARKING, GROUNDWATER RECHARGE ETC. ALONG WITH MODIFICATION & INTEGRATION OF EXISTING INFRASTRUCTURES LIKE ADMIN BUILDING, WORKSHOP BAYS ETC. WITH NEW PROPOSED BUILDINGS AND WORKSHOP BAYS. (IV) THE EXPANSION PROJECT IS TO BE DESIGNED AND EXECUTED AS PER BHEL APPROVED GREEN BUILDING NORMS. FOR ABOVE MENTIONED PROJECT-PREPARATION AND SUBMISSION OF GOOD FOR CONSTRUCTION (GFC) DRAWINGS FOR CONSTRUCTION OF RCC ADMIN BUILDINGS: LIKE BUILDING FOUNDATIONS, PLINTHS, COLUMNS, BEAMS, SLABS AND OTHER ELEMENTS OF STRUCTURE, PLANS / SECTIONS AND ELEVATIONS AT ALL RELEVANT LOCATIONS, FINISHING SCHEDULE AND DETAILS OF DOORS/ WINDOWS/VENTILATORS / GATES ASSOCIATED ACTIVITIES RELATING TO GREEN BUILDING ETC. COMPLETE FOR SATISFACTORY AND SMOOTH PROGRESS OF EXECUTION. SUBMISSION OF 3D VIEWS OF BUILDINGS. SUBMISSION OF ONE SET OF HARD COPY OF THE STRUCTURAL FRAMING AND DETAILED STRUCTURAL DRAWINGS DULY SIGNED BY CONSULTANT AND VETTED BY IIT/SERC/NIT. PROVIDING SIX SETS OF DULY SIGNED HARD COPIES OF ALL THE GFC DRAWINGS. SOFT COPIES OF ALL THE DRAWINGS, DOCUMENTS AND DESIGN CALCULATIONS IN AUTOCAD AND OTHER SOFTWARE/S SHALL BE PROVIDED TO BHEL. 1 NO
5 PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF,PROVIDING DESIGN AND CONSULTANCY SERVICES FOR PREPARATION OF DETAILED ENGINEERING DESIGN AND WORKING DRAWINGS FOR CONSTRUCTION OF, (I) TWO PRE-ENGINEERED BUILDING (PEB) STEEL STRUCTURE WORKSHOPS BAYS (MACHINE BAY AND ASSEMBLY BAY), EACH HAVING PLAN AREA OF 108 M X 24 M AND 12 TO 16M CLEAR CEILING HEIGHT, EACH BAY CARRYING TWO NOS. OF EOT CRANES OF 30 MT AND 5 MT CAPACITY. CONFIRMING TO BEST GREEN BUILDING CONCEPT AND AESTHETIC APPEARANCE. (II) OFFICE BUILDINGS (UP TO G+1), HAVING 650M2 APPROX., EQUIPMENT & AUXILIARY BUILDINGS ADJOINING / IN THE VICINITY OF BAYS WITH TOTAL COVERED AREA 2350M2 APPROX. (III) OTHER INFRASTRUCTURES LIKE ROADS, APPROACHES, FRESH/INDUSTRIAL WATER LINES, DRAINAGE, SEWERAGE, LANDSCAPING, PARKING, GROUNDWATER RECHARGE ETC. ALONG WITH MODIFICATION & INTEGRATION OF EXISTING INFRASTRUCTURES LIKE ADMIN BUILDING, WORKSHOP BAYS ETC. WITH NEW PROPOSED BUILDINGS AND WORKSHOP BAYS. (IV) THE EXPANSION PROJECT IS TO BE DESIGNED AND EXECUTED AS PER BHEL APPROVED GREEN BUILDING NORMS. FOR ABOVE MENTIONED PROJECT-PREPARATION AND SUBMISSION OF GOOD FOR CONSTRUCTION (GFC) DRAWINGS FOR CONSTRUCTION OF SUB STRUCTURE OF PEB BUILDING (EXCEPT STEEL STRUCTURE WORK ) ,EQUIPMENT & AUXILIARY BUILDINGS IN DABG AREA : LIKE BUILDING FOUNDATIONS, PLINTHS, COLUMNS , BEAMS, SLABS AND OTHER ELEMENTS OF STRUCTURE, PLANS / SECTIONS AND ELEVATIONS AT ALL RELEVANT LOCATIONS, FINISHING SCHEDULE AND DETAILS OF DOORS/ WINDOWS/VENTILATORS / GATES ASSOCIATED ACTIVITIES RELATING TO GREEN BUILDING ETC. COMPLETE FOR SATISFACTORY AND SMOOTH PROGRESS OF EXECUTION. SUBMISSION OF 3D VIEWS OF BUILDINGS. SUBMISSION OF ONE SET OF HARD COPY OF THE STRUCTURAL FRAMING AND DETAILED STRUCTURAL DRAWINGS DULY SIGNED BY CONSULTANT AND VETTED BY IIT/SERC/NIT. PROVIDING SIX SETS OF DULY SIGNED HARD COPIES OF ALL THE GFC DRAWINGS. SOFT COPIES OF ALL THE DRAWINGS, DOCUMENTS AND DESIGN CALCULATIONS IN AUTOCAD AND OTHER SOFTWARE/S SHALL BE PROVIDED TO BHEL. 1 NO