Opening Date : Thu 6th March, 2025
Closing Date : Tue 4th March, 2025
- ₹ 35203321.00
- NTID 39413479
Providing And Laying Dbm And Bc And Construction of Drain Of 30mtr. Wide Road Ch.17.982km To Ch. 18.910km (balance Work ) In Sector-22d Yea .and Laying Water Supply System For 7percent Abadi Plot Village Dhanauri,yeida Wc-04
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
713000.00 -
Document Cost
5335.00 -
Estimated Cost
35203321.00
BOQ Items Total Items : 30 | Total Qty : 573563.374
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. UPPWD/SOR-2020/259 | 14848.0000 | Sqm |
2 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, floods banks, marginal banks and guide banks or filling up ground depressions, all leads up to 1.00 km MORTH. all kind of soil. | 2843.1000 | Cum |
3 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres. UPPWD/SOR-2020/16.1 | 1731.6000 | Sqm |
4 | Supplying and stacking at site 90 mm to 45 mm size stone aggregate. (UPPWD/SOR-2020/16.3.1) | 108.1200 | Cum |
5 | Supplying and stacking at site 63 mm to 45 mm size stone aggregate. (UPPWD/SOR-2020/16.3.1) | 522.8300 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054