Proposed Development Work phas, Latehar - Tender Details
Explore tender information for Proposed Development Work phas in Latehar, including eligibility, deadlines, and bid specifics.
Jharkhand State Building Construction Corporation Limited
Latehar, Jharkhand, India
NTID 39406636
Opening Date : Tue 18th March, 2025
Closing Date : Mon 17th March, 2025
- ₹ 0.00
- NTID 39406636
Proposed Development Work(phase-2) Of Netarhat Tourism Project Under Latehar District
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
4092000.00 -
Document Cost
10000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 475 | Total Qty : 352985.62
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 20762.18 | sqm |
2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 7099.84 | sqm |
3 | Earthwork in excavation in foundation trenches in ordinary soil (Wide classification of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction of E/I.. | 9961.03 | cum |
4 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 2093.76 | cum |
5 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I | 4635.25 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054