Opening Date : Fri 7th March, 2025
Closing Date : Thu 6th March, 2025
- ₹ 5614000.00
- NTID 39423319
Power Supply To Omav, Suakati In The District Of Keonjhar.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
56140.00 -
Document Cost
11800.00 -
Estimated Cost
5614000.00
BOQ Items Total Items : 47 | Total Qty : 952.8
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply, Installation, Testing and Commissioning of 11 Mtr long 150X150X6 mm GI joist pole (34.6Kg/Mtr) including earth excavation work, concreting & couping of pole (2.13Mtr X 0.4 Mtr X 0.4 Mtr=0.34 Cum) with PCC (1:3:6), including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | 8.000 | Each |
2 | Supply, Installation, Testing and Commissioning of 13 Mtr long 150X150X6 mm GI joist pole (34.6Kg/Mtr) including earth excavation work, concreting & couping of pole (2.46Mtr X 0.4 Mtr X 0.4 Mtr=0.39 Cum) with PCC (1:3:6), including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | 6.000 | Each |
3 | Supply, Installation & comissioning of 11 KV, GI V cross Arm of 10.2 Kg (Each) including all accessories, labour cost, T&P etc complete work as per Direction of EIC. | 4.000 | Each |
4 | Supply, Installation & comissioning of 11KV, GI F Pole top Clamp including all accessories, labour cost, T&P etc complete work as per Direction of EIC. | 4.000 | Each |
5 | Supply, Installation & comissioning of GI Back Clamp for V Cross Arm (0.85Kg each) including all accessories, labour cost, T&P etc complete work as per Direction of EIC. | 4.000 | Each |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054