ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPilibhit Road Par Isthit Barri, Bareilly - Tender Details
Explore tender information for Pilibhit Road Par Isthit Barri in Bareilly, including eligibility, deadlines, and bid specifics.
Bareilly Development Authority
Bareilly, Uttar Pradesh, India
NTID 38915837
- Opening Date : Wed 12th February, 2025
- Closing Date : Mon 10th February, 2025
- ₹ 384098007.00
- NTID 38915837
Pilibhit Road Par Isthit Barrier No-02 Se Bada Byepass (km 0.00 To 3.900) Sadak Ka Chaudikaran Ka Karye
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
7682000.00 -
Document Cost
30000.00 -
Estimated Cost
384098007.00
BOQ Items Total Items : 31 | Total Qty : 469695.15
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing jungle including uprooting of vegetation grass, bush, wood, trees and sapling of girth up to 30cm. Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area. SOR no 259 | 94217.04 | nos |
2 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 8km lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the engineer incharge Same as in item no. 253 above but including watering, dressing & compacting the soil to achieve 95% proctor density | 56780.88 | nos |
3 | Excavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5 m & Iead upto 30m Including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches | 2340 | nos |
4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 16274 | nos |
5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 22097.5 | nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054