Tender for PUBLIC HEALTH ENGINEERING DEPARTMENT - NTID 30695013
PUBLIC HEALTH ENGINEERING DEPARTMENT
Chhatna, West Bengal, India
NTID 30695013
- Opening Date : Mon 20th February, 2023
- Closing Date : Fri 17th February, 2023
- ₹ 0.00
- NTID 30695013
Operation, And Guarding Of Pumping Machineries And Sub-station Equitments At Intake And Clear Water Pumping Station At Kukrakuri Under Chhatna, Saltora Block Sub-surface Water Based Piped Water Supply Scheme (brgf Phase-i) Under Bmd, Phe Dte.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70200.00 -
Document Cost
750.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 10 | Total Qty : 2401
# | Item | Quantity | Units |
---|---|---|---|
1 | INTAKE Operation and guarding of 6(Six)nos (4W+2S) vertical turbine pumping machineris each having motor capacity of 75 KW including , L.T. PDB panel cum MCC panels individual Soft starter panels,electrical gadgets, actuator operated butterfly valves, flow meters, level indicators etc installed at intake pumping station and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaging 2(Two) nos skilled, semiskilled and unskilled personnel as per direction of E.I.C CLEAR WATER Operation and guarding of 5nos(3W+2S) HSC pumping machinery each having motor capacity of 670 KW (H.T) including others pumps, H.T. PDB panel cum MCC panels individual motor controll starter panels, electrical gadgets, All valves, flow meters, level indicators etc and 40KVA D.G set installed at clear water pumping station and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaging 3(Three) nos skilled, semiskilled and unskilled personnel as per direction of E.I.C (w.e.f. 01-03-2023 to 29-02-2024) | 366 | /Day |
2 | Routine and periodical maintenance i) intake pumps, motors, valves with actuators, tightening of nut bolt of sluice valve, air valve, dismantling joint etc, replacement of gland packing for pumps and sluice valves with proper lubrication of motor bearings including replacements of indicating lamp with holder etc. as per direction of E.I.C. ii) Clear water pumps, motors, valves with actuators, tightening of nut bolt of sluice valve, air valve, dismantling joint ,replacement of gland packing for pumps and sluice valves with proper lubrication of motor bearings including replacements of indicating lamp with holder etc. as per direction of E.I.C. (w.e.f. 01-03-2023 to 29-02-2024) | 366 | /Day |
3 | SUB-STATION Operation and guarding of outdoor type 33/6.6. KV Sub-Station (3150KVA x 2nos Transformer) for Clear water equipments and 33/0.433. KV (500KVA x 2 nos Transformer) for Intake equipments including Sub-Station equipment s, and other allied accessories including operation of HV Panel Boards, Control Panel Board, Capacitor Banks, 110 Volt DC trip circuit, battery charger etc. also operation of LV panel board for lighting arrangement by engaging 2(Two) nos operating personnel as per direction of E.I.C. (w.e.f. 01-03-2023 to 29-02-2024) | 366 | /Day |
4 | Routine and periodical maintenance:- i) For Intake Sub-Station PDB panel board- 2nos , VCB Panel-2nos cables, capacitors, transformer, battery with battery charger, CT & PTs earthing system all breakers, tightening nuts & bolts of bus bar, replacement of control fuses, indicating lamp with holder etc. as per direction of E.I.C. ii) For Clear Water Sub-Station PDB panel board- 2nos VCB Panel-2nos cables, capacitors, transformer, battery with battery charger, CT & PTs earthing system all breakers, tightening nuts & bolts of bus bar, replacement of control fuses, indicating lamp with holder etc. as per direction of E.I.C. (w.e.f. 01-03-2023 to 29-02-2024) | 366 | /Day |
5 | Servicing, Testing and Calibration i) 33/6.6. KV Sub-Station (3150KVA x 2nos Transformer) for Clear water equipments and ii) 33/0.433. KV (500KVA x 2 nos Transformer) for Intake equipments, and different relays, breakers, meter contacor etc and cleaning of carbon shoots from bus bar, breaker, CT & PT chamber etc. for smooth operation of the Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C.as per scope of work. (Ones in a year) N.B- Report for all Testing & Servicing certificate to be submitted | 1 | L.S |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane