- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY
- >
NTID 31371503
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowO m Of Stp supply Installatio in Noida - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "O m Of Stp supply Installatio" in Noida, India.
NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY
Noida, Uttar Pradesh, India
NTID 31371503
- Opening Date : Tue 28th March, 2023
- Closing Date : Mon 27th March, 2023
- ₹ 3552359.00
- NTID 31371503
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
71100.00 -
Document Cost
2124.00 -
Estimated Cost
3552359.00
BOQ Items Total Items : 16 | Total Qty : 1672.4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply Installation Testing Commissioning of Online open channel /Ultrasonic Clamp on Flow meter microprocessor based ultrasonic type Flow meter along with following features: 1) Type of Display: 2-Line LCD display with operational Key.2) Transmeter type: Remote wall mounted with cable gland. 3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4)Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-250VAC, 45-65Hz, optinal : 11-40VDC 6) Self diagnostic features 7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate 8) Memory: 100% secure data storage 9) Communication: Suitable for wired communication. 10) Protection class:IP67. (Open UGR 54 MLD STP SECTOR 54,Open UGR 25 MLD STP SECTOR 50,Covered UGR 35 MLD STP SECTOR 123,COVERED UGR 50 MLD STP SECTOR 168,Open INLET WELL / CHAMBER IN Influent MSPS 1 & 2 ) | 8.00 | Nos |
| 2 | Contractor has to maintain all Five Years O&M from the date of commisioning and 1st year O&M maintain by contractor by his own cost.(Including 1st Year O & M cost): 2nd Year O&M Amount provided to Contractor will be 3% of Order value. | 1.00 | Job |
| 3 | 3rd Year O&M Amount provided to Contractor will be 3% of Order value. | 1.00 | Job |
| 4 | 4th Year O&M Amount provided to Contractor will be 3% of Order value. | 1.00 | Job |
| 5 | 5th Year O&M Amount provided to Contractor will be 3% of Order value. | 1.00 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054