PRADHAN MANTRI GRAM SADAK YOJANA
Darbhanga, Bihar, India
NTID 38916899
- Opening Date : Fri 24th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 58679676.00
- NTID 38916899
Ndb-brrp2-876-darbhanga 2
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1173594.00 -
Document Cost
10000.00 -
Estimated Cost
58679676.00
BOQ Items Total Items : 283 | Total Qty : 51028.339
# | Item | Quantity | Units |
---|---|---|---|
1 | RCD Near Subhchandra Kumar TO Kumari Mushari Setting Out Pillars Providing & Fixing of Working benchmark Pillars 2 nos. per km & 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 7.000 | No. |
2 | Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I | 0.320 | Hec |
3 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 . (Including Royality & Labour Cess). For 1000 m lead @ 20 % | 191.970 | Cum |
4 | For 100 m lead @ 80% | 767.900 | Cum |
5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1. (Including Royality & Labour Cess). | 1176.880 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054