Tender for UTTARAKHAND POWER CORPORATION LIMITED - NTID 29972108
UTTARAKHAND POWER CORPORATION LIMITED
Kashipur, Uttarakhand, India
NTID 29972108
- Opening Date : Thu 15th December, 2022
- Closing Date : Wed 14th December, 2022
- ₹ 0.00
- NTID 29972108
Mri Of Kcc Solar Stw Jal Sansthan Jal Nigam And Non Kcc Rts-1 Rts-2 Having Load 5 Kw To 25 Kw With Detailed Report With Phasors Instantaneous Parameter Monthly Consumption Temper Report Load Survey And Bill Distribution Of Consumer Under Edd Bazpur
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
71600.00 -
Document Cost
1180.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 4 | Total Qty : 2320
# | Item | Quantity | Units |
---|---|---|---|
1 | MRI of KCC consumers having load from (5 to 25 kw) including Solar consumers by 8th day of every month with Detailed MRI Report. (Phasors, Instantaneous parameters, monthly consumption, tamper event/load survey report, detailed analysis report etc) shall be provided in hard copy as well as in soft copy to EDD Bazpur. (Cost of Manpower engaged, Vehicle utilize, fuel expenditure, Paper soft media like CD/Pen drive/Hard Disk etc.) Shall be included and after preparation of bill, bills also be distributed by contractor & verify/collect ID/KYC of owner of premises. 1-KCC consumer = 412 2-Solar consumers = 20 | 432 | No |
2 | MRI of Jalsansthan/Jalnigam and STW consumers by 8th day of every month with Detailed MRI Report. (Phasors, Instantaneous parameters, monthly consumption, tamper event/load survey report, detailed analysis report etc) shall be provided in hard copy as well as in soft copy to EDD Bazpur. (Cost of Manpower engaged, Vehicle utilize, fuel expenditure, Paper soft media like CD/Pen drive/Hard Disk etc) Shall be included and after preparation of bill, bills to be distributed by contractor and getting the Electricity bills verified from the STW/Jal Sansthan/Nigam office and submitted to EDD Bazpur. 1-STW consumer=70 2-Jal sansthan/Jal nigam consumer=18 | 88 | No |
3 | MRI of Non KCC consumers having load from (5 to 25 kw) 3 time in a year (every 4 month in a year) with Detailed MRI Report. (Phasors, Instantaneous parameters, monthly consumption, tamper event/load survey report, detailed analysis report etc) shall be provided in hard copy as well as in soft copy to EDD Bazpur. (Cost of Manpower engaged, Vehicle utilize, fuel expenditure, Paper soft media like CD/Pen drive/Hard Disk etc.) Shall be included and verify/collect ID/KYC of owner of premises. | 550 | No |
4 | MRI of Domestic consumers having load from (equal and above 5 kw) 3 time in a year (every 4 month in a year) with Detailed MRI Report. (Phasors, Instantaneous parameters, monthly consumption, tamper event/load survey report, detailed analysis report etc) shall be provided in hard copy as well as in soft copy to EDD Bazpur. (Cost of Manpower engaged, Vehicle utilize, fuel expenditure, Paper soft media like CD/Pen drive/Hard Disk etc.) Shall be included and verify/collect ID/KYC of owner of premises. | 1250 | No |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane