ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowModification And Maintenance U, Gautam Budnagar - Tender Details
Explore tender information for Modification And Maintenance U in Gautam Budnagar, including eligibility, deadlines, and bid specifics.
Yamuna Expressway Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 38885567
- Opening Date : Fri 24th January, 2025
- Closing Date : Wed 22nd January, 2025
- ₹ 28499845.00
- NTID 38885567
Modification And Maintenance Under Operation Kayakalp For J.h.s And P.s Balance Work In(zone-08)phase-2 Yeida Wc-06
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
570000.00 -
Document Cost
4620.00 -
Estimated Cost
28499845.00
BOQ Items Total Items : 29 | Total Qty : 226323.37
# | Item | Quantity | Units |
---|---|---|---|
1 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08%and conforming to IS: 15622, of approved make, in all colours and shades,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand),jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. UP PWD SOR 2020/11.41.2 | 4924.2500 | Cum |
2 | Distempering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including the surface even with plaster of Paris or approved synthetic materials and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (but for every coat after the first coat). (UPPWD/SOR-2020/649+650) | 13253.0700 | Sqm |
3 | Finishing walls with textured exterior paint of required shades new work (Two or more coats applies @ 3.28 ltr per/10 sqm) over & incluidng priming coat of exterior primer applied @2.20 kg/ 10. ( DAR / 13.45.1/Based on UPPWD SOR 2020) | 7051.2100 | Sqm |
4 | Painting with synthetic enemel paint of approved brand and manufacture to give an even shade:Two or more coats on new work.UP PWD SOR 2020/13.61.1 | 2062.0500 | Sqm |
5 | Providing and fixing brass bib cock of approved quality: 15 mm nominal bore (DAR/18.15.1/Based on UPPWD/SOR-2020)) | 207.0000 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054