- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of PRADHAN MANTRI GRAM SADAK YOJANA
- >
NTID 39807044
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Mh30105 Proposed Construction , Murbad - Tender Details
PRADHAN MANTRI GRAM SADAK YOJANA
Murbad, Maharashtra, India
NTID 39807044
- Opening Date : Wed 9th April, 2025
- Closing Date : Tue 8th April, 2025
- ₹ 15981177.00
- NTID 39807044
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
150000.00 -
Document Cost
11800.00 -
Estimated Cost
15981177.00
BOQ Items Total Items : 47 | Total Qty : 23807.25
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (A) In area of Non-thorny jungle | 0.34 | One Hectere |
2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (B) In area of thorny jungle | 0.23 | One Hectere |
3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and croun-sections, and transporting to the embankment location with a lift upto 1.5 m and lead above 1000 m as per Technical Specification MORD 2014 Clause 302.3 | 3269.00 | One Cubic meter |
4 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead above 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and croun-sections as per Technical Specification MORD 2014 Clause 302.3.5 | 905.00 | One Cubic meter |
5 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and croun-sections, loading and disposal of cut rock with a lift upto 1.5 m and with all leads as per Technical Specification MORD 2014 Clause 302.3.5 | 302.00 | One Cubic meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054