ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Malappuram District Panchayath, Malappuram - Tender Details
Explore tender information for Malappuram District Panchayath in Malappuram, including eligibility, deadlines, and bid specifics.
Forest Industries (Travancore) Ltd
Malappuram, Kerala, India
NTID 39377617
Opening Date : Tue 25th February, 2025
Closing Date : Mon 24th February, 2025
- ₹ 4000000.00
- NTID 39377617
Malappuram District Panchayath Pro- No 176-25 Construction Of Vcb At Valiyathodu In Pookkottoor
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
2950.00 -
Estimated Cost
4000000.00
BOQ Items Total Items : 22 | Total Qty : 5471.363
# | Item | Quantity | Units |
---|---|---|---|
1 | VCB | ||
2 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 206.6570 | cum |
3 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.2900 | cum |
4 | 60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 22.0000 | metre |
5 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 72.0000 | hour |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054