Tender for Public Works Department - NTID 29348215
Public Works Department
Dhalai, Tripura, India
NTID 29348215
- Opening Date : Sat 15th October, 2022
- Closing Date : Sat 15th October, 2022
- ₹ 2400903.00
- NTID 29348215
Maintenance Of Road From Manu To Fatikroy From Ch. 6.00 Km To 7.32 Km During The Year 2022-23
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
48018.00 -
Document Cost
1000.00 -
Estimated Cost
2400903.00
BOQ Items Total Items : 4 | Total Qty : 14879.66
# | Item | Quantity | Units |
---|---|---|---|
1 | Tack Coat Providing and applying tack coat using hot stright run bitumen of grade (VG 30) in/c heating the bitum en, spraying the bitumen cleaning and preparing the existing road surface as per specification on Bituminous surface 0.50 kg/sqm. | 4950.000 | Sqm |
2 | 20 mm thick Open Graded Premix Carpet using Bituminous (penetration grade/ modified bitumen) Binder Providing , laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case I By Manual Means i) Bitumen (60/70 grade)VG30 | 4950.000 | Sqm |
3 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510 A) By Manual Means Case IV Type D (premix with fine sand i) Bitumen (60/70 grade)VG 30 | 4950.000 | Sqm |
4 | Maintenance of bituminous surface road Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. | 29.6600 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane