Tender for GORKHALAND TERRITORIAL ADMINISTRATION - NTID 30630449
GORKHALAND TERRITORIAL ADMINISTRATION
Darjeeling, West Bengal, India
NTID 30630449
- Opening Date : Fri 3rd February, 2023
- Closing Date : Tue 31st January, 2023
- ₹ 299263.00
- NTID 30630449
Kitchen Of Divya Prakash Samaj Ghar At Bich Gaon, Tiffin Dara Under Rangbang Gopaldhura.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5985.00 -
Document Cost
Refer Documents -
Estimated Cost
299263.00
BOQ Items Total Items : 38 | Total Qty : 377.513
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. (a)Depth of excavation not exceeding 1500mm | 1.031 | Cum |
2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 4.608 | Cum |
3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 18.830 | Sqm |
4 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (B) With N.B. Variety stone metal. (a) 1:3:6 proportion | 3.094 | Cum |
5 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (a) With earth obtained by fresh excavation upto 1800 mm. depth (including the cost of excavation from land arranged by the Deptt. within a lead of 100 m.) | 3.524 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane