ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowKiifb-construction Of Vented C, Thiruvananthapuram - Tender Details
Explore tender information for Kiifb-construction Of Vented C in Thiruvananthapuram, including eligibility, deadlines, and bid specifics.
KERALA IRRIGATION INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
Thiruvananthapuram, Kerala, India
NTID 38950976
- Opening Date : Fri 31st January, 2025
- Closing Date : Wed 29th January, 2025
- ₹ 45218637.00
- NTID 38950976
Kiifb-construction Of Vented Cross Bar (vcb) Cum Causeway Across Periyar River Near Vellakkayam In Ward No. 10 And Pallikkavala In Ward No. 5 Of Vazhathoppu Gp-and Protecting Both Bank Of Cheruthoni River-general Civil Work
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
9759.00 -
Estimated Cost
45218637.00
BOQ Items Total Items : 104 | Total Qty : 12424.438
# | Item | Quantity | Units |
---|---|---|---|
1 | Appendix A - Construction of VCB cum Causeway at Vellakkayam | ||
2 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br> | 10.800 | cum |
3 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br> | 0.037 | Hectare |
4 | OD29626/2024-2025:Construction of ring bund for the construction of RCB with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete and including bailing out of water ( Contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction). | 156.000 | metre |
5 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 1806.970 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054