ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Karad Industrial Area M And R , Kolhapur - Tender Details
Explore tender information for Karad Industrial Area M And R in Kolhapur, including eligibility, deadlines, and bid specifics.
Maharashtra Industrial Development Corporation
Kolhapur, Maharashtra, India
NTID 39434611
Opening Date : Mon 10th March, 2025
Closing Date : Fri 7th March, 2025
- ₹ 919364.00
- NTID 39434611
Karad Industrial Area M And R To Wss At Karad Industrial Area Desilting Of Jackwell Repairing Of Inlet Gate And Supply Of 3hp Submersible Pump At Jackwell Of Karad Industrial Area
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 49 | Total Qty : 1654
# | Item | Quantity | Units |
---|---|---|---|
1 | Sub Estimate : No. :1 - Desilting of Jack well at Karad Indl Area .. | ||
2 | Desilting the Supply Well, Intake Well / Head Works, Sump of water supply / sewerage works etc. in wet or dry condition including lifts upto 9 M and lead upto 150 M as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, as directed by Engineer-in-charge. | 130.00 | Cubic meter |
3 | Add for each additional lift of 1.5 M beyond initial lift 9.0 M | 900.00 | Cubic meter |
4 | Dewatering charges for estima tion purpose for head works in river basin or dam : Notes 1) The Contractor at his request may be allowed to start construction of masonry steining so as not to allow silting of well in oncoming monsoon and while paying masonry, 25% amount shall be withheld and released only when excavation to the full depth is completed. 2) Dewatering : Total dewatering charges are to be proposed in the tender as lumpsum amount and 75% is payable for excavation and 25% is payable for construction of well/ gallery. Out of 75% excavation, break-up shall be as under: 25% for last 1 M depth. 20% for 2 M depth which just above last 1 M depth. 15% for 2 M depth which just above last 3 M depth. 15% for the rest of depth from water table level. 3) The provisions made for dewatering in the tender being on lumpsum basis, the same shall have to be reduced / increased proportionately as the length of approach channel, connecting main or approach bridge reduces / increases during actual execution. Condition Nos. (1) & (2) shall appear in tender conditions.( 5) Jack Well of 6 M dia. | 1.00 | Nos |
5 | HIRE CHARGES OF MACHINERIES |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054