MUZAFFARNAGAR DEVELOPMENT AUTHORITY
Muzaffarnagar, Uttar Pradesh, India
NTID 38885639
- Opening Date : Thu 23rd January, 2025
- Closing Date : Wed 22nd January, 2025
- ₹ 38000000.00
- NTID 38885639
Janpad Shamli K Naveen Collectrate Pariser Mai Sthit Park Ke Nirman Or Sondhariyakaran Ka Karya.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
601000.00 -
Document Cost
11800.00 -
Estimated Cost
38000000.00
BOQ Items Total Items : 41 | Total Qty : 28197
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of Boundary wall | ||
2 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 M from the foundation trenches. (S.I. No. 251a) /2022 | 509.00 | Cum |
3 | Concrete with 4 cm gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour, T&P etc. required for proper completion of the work. (SI No.273/2022) | 59.00 | Cum |
4 | M-150 Brick Work in 1:4 one cement and four coarse sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour , T&P etc. required for proper completion of the work. SI No. 305(a)/2022 | 75.00 | Cum |
5 | RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 in raft and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. S.I. No. 287(a) /2022 | 115.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054