Inquiry NowInter Connection Existing Main, Dankuni - Tender Details
Explore tender information for Inter Connection Existing Main in Dankuni, including eligibility, deadlines, and bid specifics.
MUNICIPAL AFFAIRS DEPARTMENT
Dankuni, West Bengal, India
NTID 38876224
- Opening Date : Tue 28th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 1056954.00
- NTID 38876224
Inter Connection Existing Main Pipe Line To Distribution Pipe Line Including Supply Of Pipe And Accessories In Ward No-01,13,17,18 Under Dankuni Municipality
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21139.00 -
Document Cost
Refer Documents -
Estimated Cost
1056954.00
BOQ Items Total Items : 20 | Total Qty : 1935578.379
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 4.000 | EACH |
2 | Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 22.500 | Cum |
3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a. Depth of excavation not exceeding 1500mm | 202.500 | %Cu.M |
4 | Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements] 150mm dia. | 300.000 | %M |
5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made based on the basis of measurement of finished quantity of work. (a) With earth obtained from excavation of foundation | 180.669 | %Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054