ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowInstallation Work Of Wet Waste, Parichha - Tender Details
Explore tender information for Installation Work Of Wet Waste in Parichha, including eligibility, deadlines, and bid specifics.
Directorate of Local Bodies UP
Parichha, Uttar Pradesh, India
NTID 38899889
- Opening Date : Thu 16th January, 2025
- Closing Date : Thu 16th January, 2025
- ₹ 3532000.00
- NTID 38899889
Installation Work Of Wet Waste Processing Unit
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
71000.00 -
Document Cost
3600.00 -
Estimated Cost
3532000.00
BOQ Items Total Items : 43 | Total Qty : 6986.23
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in Foundation in black cotton soil in bundelkhand area requiring use of special tools and plants such as pick axes and sabbal etc. | 101.68 | cum |
2 | Earth work in cutting or in Filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20") in depth and earthwork in embankment to be in 20 cm(8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge. | 61.08 | Cum |
3 | Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 12 : 6 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. | 67.46 | Cum |
4 | R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4 in Plinth beam/lighter beam/COLUMN/SLAB excluding supply of reinforcement and its binding wire and including its fixing and binding the same with 24 B W.G.G.I. binding wire an including neccecary centering & shuttering etc & also including supply of all materials labour & T&P etc required for proper completion of the work. Binding wire cost being included in the item No-285-1st.Ch.05 | 41.47 | Cum |
5 | First class brick work in 1:6 cement and fine sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.Sl. No.-303. Ch.-06 | 63.29 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054