ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowInstallation Of Solar Water Pu, DINAJPUR - Tender Details
Explore tender information for Installation Of Solar Water Pu in DINAJPUR, including eligibility, deadlines, and bid specifics.
ZILLA PARISHAD
DINAJPUR, West Bengal, India
NTID 38923137
- Opening Date : Tue 21st January, 2025
- Closing Date : Sun 19th January, 2025
- ₹ 289920.00
- NTID 38923137
Installation Of Solar Water Pump For Drinking Water At Bherostan Fps Under Mahua Gram Panchayat
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 36 | Total Qty : 281.74
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil including mixed soil but excluding laterite or sandstone) including moving, spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, ressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm. (Page No-01, Item No-02(a)) | 2.75 | cum |
2 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. (Page No-47, Item No-03) | 5.24 | sqm |
3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety (Page No-24 of 315,ItemNo-4(a) | 0.41 | cum |
4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) c) (i) With carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth. (Page No-01, Item No-03) | 4.32 | cum |
5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (Page No-42, Item No-36) | 9.47 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054