ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowInstallation Of 10 Kwp Solar P, Lucknow - Tender Details
Explore tender information for Installation Of 10 Kwp Solar P in Lucknow, including eligibility, deadlines, and bid specifics.
SASHASTRA SEEMA BAL
Lucknow, Uttar Pradesh, India
NTID 38776766
- Opening Date : Sat 11th January, 2025
- Closing Date : Fri 10th January, 2025
- ₹ 0.00
- NTID 38776766
Installation Of 10 Kwp Solar Power Plant At 07 Border Out Posts Bops I E Bop Bharatpur Katarniaghat Mailanala Bp No 82 Rampurwa76 Bihanwakuan And Bop Dharmapur Of 70th Bn Ssb Lakhimpur Kheri Ii Up.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
172122.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 15 | Total Qty : 14
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply, Installation, Testing and Commissioning of 10 KWp Off Grid Solar Photovoltaic Power Plant conforming to MNRE/BIS specifications consisting of Mono Crystalline silicon solar cells, necessary protections, earthing for the solar system, mounted on prefabricated GI structure of suitable strength with following components complete as required including repair/maintenance of the solar power plant/equipments for its satisfactory working for a period of 05 years after installation of solar power plant:- | ||
2 | a) 10 KWp Solar Photovoltaic Module of capacity 540 Wp. or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years | ||
3 | b) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with connectors, Junction Box & AC DB & DC with MCB & SPD, glands, lugs and MC 4 connectors etc. as required. | ||
4 | c) Lighting and surge voltage protection device with connection to earth bus of existing earthing. | ||
5 | d) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054