Impvt Of B.t.c.s.m Road From 0/000 To 10/000 Km (except From 1/000 Km To 2/000 Km) In The District Of Ganjam Under State Plan
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
10000.00 -
Estimated Cost
41651654.00
BOQ Items Total Items : 17 | Total Qty : 115944.34
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision)and as per direction of Engineer-in-Charge. | 36000.00 | Each Sqm |
2 | Providing compacted granular materials by using moorum of approved quality in shoulder not exceeding 225mm watering and compacting to the required density in OMC with PRR as per approved drawing and technical specifications as per Section 900 and Clause 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge. | 2025.00 | Each Cum |
3 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @ 0.2kg. per sqm.on prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MORT&H Specification for Road & Bridge works (5th Revision.) | 64260.00 | Each Sqm |
4 | Providing & laying 50 mm thick av. compacted Bituminous Macadam (Grading-II) using VG-30 Bitumen with Hot Mix Plant using crusher broken hard granite aggregates of specified grading premixed with bituminous binder @ 3.3 % by weight of total mix and filler, transporting the hot mix to works site, lying with Hydrostatic Paver Finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compacting as per Clause No. 504 and section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5thRevision) &including cost of all materials, labour, T&P,taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 3213.00 | Each Cum |
5 | Providing and laying 25 mm thick av. compacted Semi Dense Bituminous Concrete (Grading-II) using VG-30 grade Bitumen and crusher broken hard granite aggregates of specified grading, premixed with bituminous binder @ 5.0 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paverfinisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause No.501, 508 and section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 1606.50 | Each Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane