Improvement Works To Bath And Toilets And Rest Shelters For The Use Of Employees Workers Of Port User Agencies In Southern Division Area
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
31500.00 -
Document Cost
Refer Documents -
Estimated Cost
1572844.00
BOQ Items Total Items : 59 | Total Qty : 6399.7
# | Item | Quantity | Units |
---|---|---|---|
1 | 1.Providing double scaffolding arrangement at the existing G sub station building to carry out repair/improvement works by using steel pipes of required diameter or by Casuarina poles, including providing necessary tie members, bracings etc., all round and platforms at various level adquate strength including removing the scaffolding with platform after completion of repair/improvement works all as per relevant specification and all as directed at site including all labour, materials, tools, equipments, coir, transport, fuel, etc., complete. Note: 1. 75% of payment may be released after erecting of scaffolding in all respects. 2. The balance 25% of payment will be released after completion of repair / improvement works and removal of scaffolding. 3. If casuarina poles used for scaffolding, the bottom and top dia of casuarina poles are of 100mm and 50mm respectively. | 100 | 1 M2 (One Square Metre) |
2 | 2.Earth work excavation up to 1.50m depth for renewal of sewage pipe, providing PCC, etc., including collecting and depositing the earth/sand in with in a lead of 50m for transporting all as directed at site of work including all labour, tools, equipments,transport, etc., complete. | 45.00 | 1 M3 (One Cubic Metre) |
3 | 3.Chipping thoroughly and removing the existing damaged wall tile and plastering from the wall, RCC items and wherever required without damaging the nearby structures including collecting and depositing the debris nearby dust bins within a lead of 50 m all as specified and as directed, including scaffolding , all labour,tools, equipment, transport, etc., complete. | 65.00 | 1M (One square meter) |
4 | 4.Dismantling and removing the existing wornout wooden/ Steel/aluminium doors , windows, ventilators etc including frame with shutters without damaging the structures nearby, including transporting and handing over the same to departmental stores / RSO yard within a lead of 2km all as specified and as directed at site of work including all labour, tools, equipments, transport, fuel etc., complete. | 50.00 | 1 No (One Number) |
5 | 5.Dismantling and removing the existing wornout MS grills, grill gate etc including frame without damaging the structures nearby, including transporting and handing over the same to departmental stores / RSO yard within a lead of 2km all as specified and as directed at site of work including all labour, tools, equipments, transport, fuel etc., complete. | 15.00 | 1M (One square meter) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane