ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement To Road From N h , SHAHUWADI - Tender Details
Explore tender information for Improvement To Road From N h in SHAHUWADI, including eligibility, deadlines, and bid specifics.
PANCHAYAT SAMITI
SHAHUWADI, Maharashtra, India
NTID 38790475
- Opening Date : Thu 16th January, 2025
- Closing Date : Wed 15th January, 2025
- ₹ 4880041.00
- NTID 38790475
Improvement To Road From N.h. 204 To Kerle To Mdr No 2 To Palsavade Jambur Thavade Sondoli To Charan District Border Road I.e. (odr No 02)tal-shahuwadi Dist Kolhapur (ch 16/00 To 18/500)
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
48800.00 -
Document Cost
8000.00 -
Estimated Cost
4880041.00
BOQ Items Total Items : 32 | Total Qty : 14379.16
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts excetra complete. Item / Page No : 11 / 215 Additional Specifications : The work shall be carried out as directed by Engineer-In-Charge. | 33.6900 | Cubic Metre |
2 | Removing Non Pressure class 2 and Non Pressure class 3 pipes including stacking at road side as directed by the Engineer in charge. Upto 900 milimetre diameter, excetra complete. Item / Page No : 30 / 216 Additional Specifications : The work shall be carried out as directed by Engineer-In-Charge. | 5.0000 | Running Metre |
3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Mechanical Means Item / Page No : 2 / 115 Specification No : Bd.A.1 Spec. Page No : 259 | 20.0200 | Cubic Metre |
4 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means Item / Page No : 6 / 115 Specification No : Bd.A.2 Spec. Page No : 259 | 14.6200 | Cubic Metre |
5 | Providing dry dry/ trap/ granite/ quartzite/ gneiss rubble stone soiling 15 centimetre to 20 centimetre thick including hand packing and compacting, excetra complete. Item / Page No : 38 / 117 Specification No : Bd.A.12 Spec. Page No : 264 | 8.9300 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054