ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement To Road From Mdr 7, SHAHUWADI - Tender Details
Explore tender information for Improvement To Road From Mdr 7 in SHAHUWADI, including eligibility, deadlines, and bid specifics.
PANCHAYAT SAMITI
SHAHUWADI, Maharashtra, India
NTID 38790509
- Opening Date : Thu 16th January, 2025
- Closing Date : Wed 15th January, 2025
- ₹ 1952844.00
- NTID 38790509
Improvement To Road From Mdr 74 To Lagarewadi Road I.e. (vr No 185) Tal-shahuwadi Dist-kolhapur.(ch 0/00 To 1/00)
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
19528.00 -
Document Cost
2000.00 -
Estimated Cost
1952844.00
BOQ Items Total Items : 22 | Total Qty : 10399.25
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. Item / Page No : 18 / 24 Specification No : MORTH-301, 309 Spec. Page No : 45-53, 85-89 | 81.0000 | Cubic Metre |
2 | Picking the road surface including sectioning, excetra complete. (Black topped surface) Item / Page No : 33 / 25 Specification No : MORTH-501 Spec. Page No : 208 | 600.0000 | Square Metre |
3 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 60 milimetre metal, by breaking rubble obtained by blasting. (Hand broken). Item / Page No : 54A / 345 Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | 46.2000 | Cubic Metre |
4 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 40 milimetre metal, by breaking rubble obtained by blasting. (Hand broken). Item / Page No : 55 / 345 Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | 81.0000 | Cubic Metre |
5 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. Item / Page No : 29a / 25 Specification No : MORTH-408 Spec. Page No : 139-142 | 126.7500 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054