ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement To Parkod To Bisor, Bhawanipatna - Tender Details
Explore tender information for Improvement To Parkod To Bisor in Bhawanipatna, including eligibility, deadlines, and bid specifics.
Department of Rural Development
Bhawanipatna, Odisha, India
NTID 38908949
- Opening Date : Fri 31st January, 2025
- Closing Date : Thu 30th January, 2025
- ₹ 141252000.00
- NTID 38908949
Improvement To Parkod To Bisora Road In The District Of Nuapada Under Mmsy-improvement To Existing Rd Road For The Year 2024-25
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1412520.00 -
Document Cost
10000.00 -
Estimated Cost
141252000.00
BOQ Items Total Items : 123 | Total Qty : 519402.81
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 72810.00 | Sqm |
2 | Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 169.82 | Cum |
3 | Dismantaling of of Brick / stone masonary in cement mortar above 3 mtr height for existing structures including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviciable materials and stacking the serviciable materials with all lifts and lead of 1000 m as per specification and as per the direction of Engineer-in-charge. | 50.40 | Cum |
4 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | ||
5 | Upto 600mm dia | 67.50 | Rm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054