Improvement To Existing Storage Irrigation Tank In Sy.no.154/1, Kulanwada, Savoi Verem In Priol Constituency Of Ponda Taluka.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 1154.25
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete. a. All kinds of soil. | 78.38 | cu.m |
2 | Reinforced cement concrete work in well steining excluding the cost of centering, shuttering, finishing and reinforcement with 1:1 :3 (1 cement: 1 coarse sand: 3 graded granitic or basaltic aggreate 20mm nominal size | 27.74 | cu.m |
3 | Centering & shuttering including Strutting, Propping & removal of forms for : xii: Well steining | 87.84 | sq.m. |
4 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 832.2 | kg |
5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 5.95 | cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054