ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Improvement Of Road From Block, Keonjhar - Tender Details
Explore tender information for Improvement Of Road From Block in Keonjhar, including eligibility, deadlines, and bid specifics.
Municipal Bodies
Keonjhar, Odisha, India
NTID 39435897
Opening Date : Fri 7th March, 2025
Closing Date : Tue 4th March, 2025
- ₹ 962741.00
- NTID 39435897
Improvement Of Road From Block Colony Bapi Rout House To Dipti Sahoo House And Gali Sahi In Ward No-13
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 9 | Total Qty : 1152.68
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation in all kinds of Hard soil within 50 mtr initial lead, 1.5 mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 mtr depths and as per specification and direction of E-I-C | 24.63 | cum |
2 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C | 82.40 | cum |
3 | C.C.(1:4:8) with 40mm HBHG metal including cost,carriage and royalty of materials etc complete. | 9.85 | cum |
4 | C.C.(1:3:6) with 40mm HBHG metal including cost,carriage and royalty of materials etc complete. | 29.80 | cum |
5 | RCC M-20 grade 20mm down grade course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth including watering, curing for required period 28 days,including centering & shuttering and finishing exposed surface smooth providing grooves whereever necessary including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item including hire and running charges of the machineries complete | 24.63 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054