ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGeneral Overhauling Of Six Cyl, Baramulla - Tender Details
Explore tender information for General Overhauling Of Six Cyl in Baramulla, including eligibility, deadlines, and bid specifics.
Public Works Department
Baramulla, Jammu and Kashmir, India
NTID 33233823
- Opening Date : Thu 5th October, 2023
- Closing Date : Wed 4th October, 2023
- ₹ 220141.00
- NTID 33233823
General Overhauling Of Six Cylinder Engine (shanghai-sc9d220g2b1) Of Xgma Front End Loader Of Field Sub Division Baramulla Presently Deployed At Dawar Gurez
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 16 | Total Qty : 28
# | Item | Quantity | Units |
---|---|---|---|
1 | Demounting of engine and pump assembly from the machine and shifting of the same from Dawar Gurez and back to Gurez after repairing for refitting to machine at Gurez. | 1.000 | Job |
2 | Dismantling of Engine Assembly by way of removal of tappet cover, removal of rocker arms assembly, pushrods, fuel injectors along with fuel lines, fuel filter housing. The job includes removal of air intake manifold and exhaust manifold & flywheel. The job also includes removal of engine head from the engine block, followed by removal of pistons along with connecting rod and bearings, crank case and crank shaft, Oil sump & other main and child parts in complete. The job includes washing of all main parts and child parts with suitable water repellent solution for cleaning and preventing from surface rusting. | 1.000 | Job |
3 | General Overhauling of Six Cylinder Engine by way of | ||
4 | Providing and fitting of Seat Valve of intake port and seat valve of exhaust port ( 06 no s each),valve guide , valve spring, valve spring retainer, valve guide, oil seals/ washers, valve seats, retainer locks and all other allied parts in complete for all six cylinders of the engine and check for leak tightness. The installation of components including valve clearance and preload set on valve spring shall be as per the recommendations of manufacturer. | 6.000 | Jobs |
5 | Complete machining of cylinder block by way of inspection of cylinder bore walls (06 Nos) for burr and wear and then preparing a finished surface by way of Boring and Honing as per requirement. | 1.000 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054