ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowFormation Of Cement Concrete R, Ariyalur - Tender Details
Explore tender information for Formation Of Cement Concrete R in Ariyalur, including eligibility, deadlines, and bid specifics.
Tamilnadu Warehousing Corporation
Ariyalur, Tamil Nadu, India
NTID 38918140
- Opening Date : Wed 29th January, 2025
- Closing Date : Tue 28th January, 2025
- ₹ 0.00
- NTID 38918140
Formation Of Cement Concrete Road From Entrance To Godown At Ariyalur Warehouse Complex
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
30500.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 7 | Total Qty : 2329
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay,stiff black cotton , hard red earth shales murram, gravel, stoney, earth mixed with small sizes boulders SS20B by deploying machinery. | 720.00 | M3 |
2 | Supplying and filling with Red Gravel in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 216.00 | M3 |
3 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam with specified thickness specification including premixing the materials with water at OMC in mechanical plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well preapred surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. | 332.00 | M3 |
4 | Plain Cement concrete 1:4:8 ( one cement, four M-sand and Eight hard broken stone jelly) using 40 mm jelly cost and conveyance of all materials and labour charges for laying curing etc for base course including compacting with platform vibrator laid in layers of not more than 15cm thick and consolidated. | 144.00 | M3 |
5 | Plain cement concrete 1:1.5:3 (one cement, one and half M-sand and three hard broken stone jelly) using 20mm jelly for flooring and wearing coat including laying 3mx3m size,compacting,finishing the top with power trowel and curing, etc complete as per standard specifications and as directed by the departmental officers. | 216.00 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054