Filtration Of Transformers Ol, Chennai - Tender Details
Explore tender information for Filtration Of Transformers Ol in Chennai, including eligibility, deadlines, and bid specifics.
COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH
Chennai, Tamil Nadu, India
NTID 39436475
Opening Date : Thu 6th March, 2025
Closing Date : Tue 4th March, 2025
- ₹ 761180.00
- NTID 39436475
Filtration Of Transformers, Oltc And Servicing Of Ht, Lt Switch Gears In Substations In Csir-serc, Csir Campus, Taramani, Chennai 113
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
15230.00 -
Document Cost
Refer Documents -
Estimated Cost
761180.00
BOQ Items Total Items : 9 | Total Qty : 241
# | Item | Quantity | Units |
---|---|---|---|
1 | Filtration of transformer oil through Stream Line filter unit to improve the Di-electric Strength to the optimum value for 1000 KVA OUTDOOR Transformers with OLTC and testing & providing the test reports for Di electric Strength and acidity of transformer oil, including the transport charges for transformer oil filter unit with oil testing equipments to site and return back. | 8.00 | Nos |
2 | Supplying and Replacing the Dehydrating Silica Gel (Approximately 1 kg) with silica gel breather for existing 1000 KVA outdoor Transformer. | 8.00 | Nos |
3 | Testing of 1000 kVA Transformer Insulation Resistance value checking primary wiring ,disconnection of primary HT cable and secondary bus duct and Re Fixing as per original conditions | 8.00 | Job |
4 | Supply of Transformer oil , as per : IS : 335 /1993 (actual quantity will be billed based on the site requirement) | 140.00 | Ltrs |
5 | Filteration of On Load Tap Changer by flushing with transformer oil using stream line filter unit including Removing and Refilling of transformer oil and Replacing top Cover Cork Rubberized Gaskets of existing 1000kVA Transformer | 8.00 | Nos |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054