Facebook
Description

Fencing Of Canal Side Plot At Jni Stadium Kaloor

Tendering Authority: Greater Cochin Development Authority

India, Kerala, Ernakulam

NTID

29359580

Last Date For Submission

11 Oct, 2022

Closing Date

11 Oct, 2022

BOQ Items Total Items : 7 | Total Qty : 510.837
# Item Quantity Units
1 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared 242.000 sqm
2 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil 2.007 cum
3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) 1.760 cum
4 Supplying at site: R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in-Charge (cost of earth works in excavation, concrete works in foundation to be paid separately) 0.990 cum
5 Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used . With G.I barbed wire. 217.600 m
Tender InquiryInquiry