Execution Of Various Works Under Rdss Scheme For Thondamuthur Sub Division Of S.n.palayam Division.

Tendering Authority: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

India, Tamil Nadu, Coimbatore

NTID

28399942

Last Date For Submission

07 Oct, 2022

Closing Date

07 Oct, 2022

BOQ Items
# Item Quantity Units
1 EXCAVATION OF POLE PITS / Stay Set:
2 For pole upto 8.00m length by using JCB/Manual 1.000 per pit
3 For pole above 8.00m length by using JCB/Manual 1.000 per pit
4 In Hard Soil (common to all size of poles) 1.000 per pit
5 In rocky area (common to all size of poles) by blasting / Manual 1.000 per pit
6 Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual 1.000 per pit
7 Excavation of Stay pit in Hard rock soil 1.000 per pit
8 Excavation & back filling of stay pit per location - Hard rock requires blasting 1.000 EACH
9 Excavation & back filling of stay pit per location - Hard rock without blasting 1.000 EACH
10 Excavation & back filling of stay pit per location - Medium rock and dense medium rock requires blasting 1.000 EACH
11 ERECTION OF POLES AND ACCESSORIES
12 Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual 1.000 per pole
13 Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual 1.000 per pole
14 Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles 1.000 per pole
15 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. 1.000 Each set
16 Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 1.000 Each set
17 Erection of stay set complete in the rock area by blasting 1.000 Each set
18 Replacement of stay rod only. (Including stay pit excavation & refilling & erection) 1.000 Each
19 Replacement of guy shackle only in existing stay 1.000 Each
20 Fixing of Line Materials
21 V cross arm 3.5 feet 1.000 per Loc
22 V cross arm 4.5 feet 1.000 per Loc
23 V cross arm 5.0 feet 1.000 per Loc
24 Fixing of LT S phase cross arm 1.000 per Cross arm
25 Fixing of LT 3 phase cross arm 1.000 per Cross arm
26 Fixing of HT / LT Ti fitting 1.000 per Loc
27 Fixing of HT PIN insulator with Pin 11 kv 1.000 per
28 Fixing of HT PIN insulator with Pin 22 kv 1.000 per
29 Fixing of HT PIN insulator with Pin 33 kv 1.000 per
30 Fixing of LT PIN insulator 1.000 per
31 Fixing of HT strain disc 11 KV 1.000 per
32 Fixing of HT strain disc 22 KV 1.000 per
33 Fixing of HT strain disc 33 KV 1.000 per
34 Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc.. 1.000 per Loc
35 Set right of all sizes of leaning poles 1.000 per pole
36 Fixing of shackle 1.000 per
37 Fixing of Aluminium knob 1.000 per
38 Fixing of HT LAS (3 Nos.) 1.000 set
39 Fixing of LT LAS (3 Nos.) 1.000 set
40 Double channel-X-Arm 1.000 EACH
41 Guarding Cross Arm 1.000 EACH
42 Tapping Channel Cross Arm 1.000 EACH
43 Fixing of open type fuse unit 1.000 NO
44 Providing of line spacers in LT lines 1 phase 1.000 E
45 Providing of line spacers in LT lines 3 phase 1.000 E
46 Fixing of LT capacitor 1.000 E
47 Erection of centre rotating Switch AB Switch complete 1.000 Set
48 Set right of all sizes of leaning poles 1.000 No.
49 Resagging of lines for all sizes at cutpoint location per wire / span 1.000 Km
50 Intergrater DT Metering Arrangements/ Whole Current Meter 1.000 EACH
51 Erection /dismantling metering set 11 KV/22 KV 1.000 EACH
52 STRINGING OF CONDUCTORS:
53 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor 1.000 Per KM(Route Length)
54 Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor 1.000 Per KM(Route Length)
55 Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator. 1.000 Per span
56 Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor 1.000 Per KM(Route Length)
57 Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor 1.000 Per KM(Route Length)
58 Releasing and reerection (resagging) of one run of all sizes of conductor 1.000 Per KM(Route Length)
59 ERECTION OF DISTRIBUTION TRANSFORMERS:
60 Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.(Double pole structure with 10 feet centre) 1.000 Per Str.
61 Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.
62 (i) Upto 25 KVA Distribution transformer / Metering set. 1.000 Each
63 (ii) Above 25 KVA to 100 KVA 1.000 Each
64 (iii) Above 100 KVA to 250 KVA 1.000 Each
65 (iv) 500 KVA and above 1.000 Each
66 (V) Failed DT replacement below 100 KVA 1.000 Each
67 (vi) Failed DT replacement 100 KVA and above 1.000 Each
68 Erection of 11 KV single pole Structure including erection of DT complete without centre support. 1.000 Per structure
69 Erection of 11 KV Single Pole structure including erection of DT complete with centre support . 1.000 Per structure
70 ERECTION OF DP STRUCTURE:
71 Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,
72 (i) With 11 KV AB switch using all types of poles of size 9.14 m and above length 1.000 Per structure
73 (i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length 1.000 Per structure
74 Erection of single pole DP with complete and with single earth 1.000 Per structure
75 CONCRETING WORKS:
76 Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)
77 (i) Mass concreting of poles 1.000 Per pole
78 (ii) Sleeve concreting 1.000 Per Location
79 (iii) Stay concreting 1.000 Per Location
80 EARTHING:
81 (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing 1.000 Each
82 (ii) Provision of spike including earthing arrangement 1.000 Per Location
83 (iii) Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length 1.000 Per Earthing pit
84 (iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination 1.000 Per Structure
85 (v) Replacement of corroded earth pipe 1.000 Per pipe
86 LOADING AND UNLOADING CHARGES:
87 Loading or unloading of Distribution Transformer
88 (i) Upto 100 KVA 1.000 Each
89 (ii) Above 100 KVA and upto 500 KVA 1.000 Each
90 (iii) Metering set of all ratios 1.000 Each
91 Loading or unloading of various sizes of poles
92 (i) REC, RCC, PSC pole upto 8.00 m length 1.000 Per pole
93 (ii) All REC, RCC pole above 8.00 m length 1.000 Per pole
94 (iii) Metal poles all sizes 1.000 Each
95 Loading of Conductor 1.000 Per drum
96 Unloading of Conductor 1.000 Per drum
97 Loading / Unloading of Iron & Steel 1.000 Per tonne
98 Loading / Unloading of Oil 1.000 Per drum
99 Loading / Unloading of line materials 1.000 Per tonne
100 Loading / Unloading of 11 KV strain disc 1.000 Per Crate
101 Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 1.000 Per Crate
102 Loading / Unloading of meters
103 (i) Single Phase Meter 1.000 Each
104 (ii)Three phase Meter 1.000 Each
105 Guarding Arrangement
106 Provision of guarding with two numbers earth pits excluding stay set erection
107 (i) Flat guarding with earth pit 1.000 Per span
108 (ii) Split neutral 1.000 Per span
109 TRANSPORTATION CHARGES:
110 Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM 1.000 Per pole
111 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading)
112 (i) For a lead upto 5 KM 1.000 Per pole
113 (ii) Above 5 KM of lead of every KM 1.000 Per pole
114 Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location
115 (i) Upto 1 KM 1.000 Per pole
116 (ii) Above 1 KM per each KM 1.000 Per pole
117 Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor 1.000 Per KM (Distance)
118 (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) 1.000 Upto one tonne
119 (ii) Above 10 KM 1.000 per KM
120 Dismantling Charges
121 Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit 1.000 Per pole
122 For breaking the mass concrete of all supports 1.000 Per pole
123 Dismantling of line materials
124 Dismantling of Double Channel X-Arm 1.000 EACH
125 Dismantling of Guarding Cross Arm 1.000 EACH
126 Dismantling of Tapping channel x arm 1.000 no
127 Dismantling of 11kv PIN with insulator 1.000 no
128 Dismantling of 11kv Composite Disc with Mp 1.000 no
129 Dismantling of 22kv PIN with insulator 1.000 no
130 Dismantling of 22kv Composite Disc with Mp 1.000 no
131 Dismantling of 33 KV Pin Insulator 1.000 EACH
132 Dismantling of 33 KV Disc 1.000 EACH
133 Dismantling of 5' V-X Arm 1.000 EACH
134 Dismantling of 1372 mm (4'6") V-X-Arm 1.000 EACH
135 Dismantling of 1068 mm (3'6") V-X-Arm 1.000 EACH
136 Dismantling of H.T/L.T. T.I. Fitting 1.000 EACH
137 Dismantling of 3ph X -Arm 1.000 no
138 Dismantling of 1ph X -Arm 1.000 no
139 Dismantling of Aluminium knob 1.000 no
140 Dismantling of LT Shackle with Mp 1.000 no
141 Dismantling of LT Pin with Insulator 1.000 no
142 Dismantling of LT open type 1.000 no
143 Dismantling of Top channel 1.000 no
144 Dismantling of Belting channel 1.000 no
145 Dismantling of Bed channel 1.000 no
146 Dismantling of metering set 11 KV / 22 KV / 33 KV 1.000 EACH
147 Dismantling of DT below 200 KVA 1.000 EACH
148 Dismantling of DT 200 KVA & above but below 500 KVA 1.000 EACH
149 Dismantling of DT 500 KVA 1.000 EACH
150 Dismantling of Knob 1.000 EACH
151 Dismantling of HT LAS (3 nos) 1.000 3 NOS
152 Dismantling of LT LAS (3 nos) 1.000 3 NOS
153 Dismantling of stay set complete
154 (i) including stay rod 1.000 Per pole
155 (ii) Without stay rod 1.000 Per pole
156 Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 1.000 Per KM
157 Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 1.000 Per KM
158 Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side 1.000 Per structure
159 Dismantling of Cross arm clamps TI fitting hardwares, insulators etc., 1.000 Per Location
160 PAINTING:
161 Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT 1.000 Each
162 Numbering of poles including base painting and with cost of paint 1.000 Per pole
163 Painting of iron poles up to 36 ft length with double coats including cost of paint 1.000 Each
164 Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 1.000 Each
165 Painting of Cement poles by Distember coating including cost of distember 1.000 Per pole
166 Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) 1.000 Per str
167 Service Connection Details painting 1.000 per service
168 MISCELLANEOUS WORKS
169 Fixing and Dismantling of Single Phase Meter 1.000 Each
170 Fixing and Dismantling of Three Phase Meter 1.000 Each
171 Releasing and erection 1 ph SC wire [during conductor or support change] 1.000 SC
172 Releasing and erection 3 ph SC wire [during conductor or support change] 1.000 SC
173 Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) 1.000 Structure
174 Re-Earthing of structure completely 1.000 STR
175 Provision of Street light, switching arrangement including fixing of meter, wiring & service board etc., 1.000 Box
176 Fixing of street light 1.000 Loc
177 Destruction of pole concreting at site 1.000 EACH
178 Retrieving grill from Deteriorated RCC pole 1.000 EACH
179 Fixing of Modem including accessories 1.000 EACH
180 Cleaning of RMU 1.000 YARD
181 Cleaning of Ring Fencing 1.000 YARD
182 Knitting of chair including supply materials. 1.000 EACH
183 WORKSHOP CHARGES:
184 Manufacturing / Altering of Clamps 1.000 Each
185 Drilling of holes in the structure materials clamps etc., 1.000 Per hole
186 AB switch or open type side arm stud, cutting and drilling holes 1.000 per set
187 Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 1.000 Per structure
188 GENERAL:
189 Numbering of Poles including cost of paint 1.000 Each / Pole
190 Painting of iron poles up to 36 ft length with double coats including cost of paint 1.000 Each
191 Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 1.000 Each
192 Removing weed in substation yard / office premises 1.000 Sq.Mtr
193 Bush Clearance out side substation yard / office premises (light) 1.000 Sq.Mtr
194 Jungle clearance such as kattu karuvai in the various area without uprooting 1.000 Sq.Mtr
195 Jungle clearance such as kattu karuvai in the various area with uprooting 1.000 Sq.Mtr
196 Clearing of tree braches of coconut trees 1.000 Per tree
197 Clearing of tree braches of Neem, Tamarind, Country wood etc 1.000 Per tree
198 Leveling of Ground using Bul Dozer 1.000 Per Hour
199 Clearing of Branches / Trees with JCB 1.000 Per Hour
200 Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection.(including all materials) 1.000 Set
201 Engaging Machines for works
202 Engaging Crane per Hour(for handling of poles,Metering set,DT etc 1.000 Per Hour
203 Engaging JCB per Hour(for handling of poles,Metering set,DT etc 1.000 Per Hour