- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Himachal Urban Development Authority
- >
NTID 39791656
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Execution Of Civil Works For D, Shimla - Tender Details
Himachal Urban Development Authority
Shimla, Himachal Pradesh, India
NTID 39791656
- Opening Date : Sat 29th March, 2025
- Closing Date : Fri 28th March, 2025
- ₹ 2405385.00
- NTID 39791656
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
48107.00 -
Document Cost
1180.00 -
Estimated Cost
2405385.00
BOQ Items Total Items : 46 | Total Qty : 9989.4675
# | Item | Quantity | Units |
---|---|---|---|
1 | Cutting in earth work by mechanical means (Hydraulic excavator)/ manual means in all heights/ depths and in all kinds of soil such as kankar, moorum, shingle and decomposed of soft rock or hard rock i.e. their intermediate classification and chiselling/ wedging out of rock where blasting prohibited including saturated soils and filling in embankments etc. where necessary and disposal of excavated unserviceable materail in all leads and lifts including through mechanical transportation. Any demage to the private/ public property during execution will be restored by the contractor whatsoever the nature of the same maybe. The serviceable materials will be stacked in specified dimensions in all leads and lifts as per the direction of the Engineer-in-charge. Reasons what soever nothing extra on account of carriage and disposal of surplus earth will not be paid to any extant. in All kinds of soil. | 304.20 | Cum |
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 2.50 | Cum |
3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil in all lead and lift as directed and entire satisfaction of the Engineer -in -charge in All kinds of soil. | 67.62 | Cum |
4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.07 | Cum |
5 | 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 8.41 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054