Tender for Haryana Government - NTID 29942330
Haryana Government
Faridabad, Haryana, India
NTID 29942330
- Opening Date : Wed 7th December, 2022
- Closing Date : Tue 6th December, 2022
- ₹ 15970072.00
- NTID 29942330
Estimate Of Twenty Three Months Maintenance And Strengthening Of Street Light System On Old Faridabad Constituency From Ward No. 28 To 34 And 13.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
319400.00 -
Document Cost
5000.00 -
Estimated Cost
15970072.00
BOQ Items Total Items : 13 | Total Qty : 351410
# | Item | Quantity | Units |
---|---|---|---|
1 | Digital time switch (corono) LandT make 110-240 VAC,IC/o BASE/DIN 25 ON/OFF (Cat No. 67DDTO) make:-LandT, Conforms to IS/IEC 60947-4-1 and IEC 60947-4-1 The cost includes installation connection with timer and MNX contactor, energy line and maintaining the system for 5 years sending the operator for resetting with timer if any disturbance or fault replacing if burn due to single facing guarantee complete up to 5 years after installation of energy meter. Complete replacement in case of burning, accident due to whatever reason. there are kundi system for ON/OFF in various area. Various high mast light also ON/OFF through Kundi system. Some details of various kundi system in sectors are also attached | 55.00 | Nos. |
2 | Erection/ Removal of LED street light 25/60/70/90/130W points installed on pole / wall including cost of material charges i.e. including ON/OFF, PVC wire, Tape, Screw etc and arranging of TandP i.e. Bans Ladder/Aluminum Ladder, Safety belt, Shoes etc on various areas complete in all respect upto the entire satisfaction of engineer in charge of the work (Duly repaired by the firm under warranty period) | 273562.00 | Nos. |
3 | Installation of Octagonal pole with muff/foundation including transportation cost. Rate from work order no. MCF/Elect/2021/339 dated: 23.08.2021) | 100.00 | Nos. |
4 | L and T MNX 70 contactor 70 A 3 pole CS97076. The cost includes installation connection with timer and MNX contactor, energy line and maintaining the system for 5 years sending the operator for resetting with timer if any disturbance or fault replacing if burn due to single facing guarantee complete up to 5 years complete replacement in case of burning accident due to whatever reason. There are kundi system for ON/OFF in various area. Various high mast light also ON/OFF through Kundi system. Some details of various kundi system in sectors are also attached | 55.00 | Nos. |
5 | Removal of damage pole with transportation charge Rate from work order no. MCF/Elect/2021/339 dated: 23.08.2021) | 48.00 | Nos. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane