Facebook
Description

Engineering, Procurement, Fabrication, Testing, Supply, Dismantling Of Old Existing And Installation Of New Complete Radiation Section Tube Assembly And Convection Section Shock (bare) Tube Assembly And M And I Of The Furnace 2112-f-01 Of Isom Unit

Tendering Authority: Indian Oil Corporation Limited

India, Gujarat, Vadodara

NTID

29108965

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items
# Item Quantity Units
1 Schedule of Rates ITEM 00010 Supply comp.rad./conv.shock tube ISOM
2 00010: Engineering, procurement of all raw materials, fabrication, supply of complete radiation section tube assembly & shock (bare) tube assembly of convection section which includes tubes, return bends, elbows, flanges, all types of fittings, weldolets, fasteners, lug plate, blind flanges, pad plates, fasteners, gaskets, spigot pipes, etc. as per attached scope and technical specifications mentioned in Annexure A. (For Detailed SOR Description SOR Line Item - 00010-00010 at Page 35-36).
3 00020: Engineering, procurement of all raw materials, fabrication, supply of complete radiation section tube assembly & shock (bare) tube assembly of convection section which includes tubes, return bends, elbows, flanges, all types of fittings, weldolets, fasteners, lug plate, blind flanges, pad plates, fasteners, gaskets, spigot pipes, etc. as per attached scope and technical specifications mentioned in Annexure A. Unit of measurement "EA" denotes Engineering, procurement of all raw materials, fabrication, supply of complete radiation section tube assembly & shock (bare) tube assembly of convection section of furnace 2112-F-01 of ISOM unit as per attached tender specifications Annexure-A. Rates are inclusive of all the components for supply of complete radiation seciton tube assembly and convection section ( shock) bare tube assembly as per attached scope & technical specifications Annexure A. Rates are inclusive of P&F, Frieght, TPI, Insurance etc. (For Detailed SOR Description SOR Line Item - 00010-00020 at Page 36-37). 1.000 EA
4 Schedule of Rates ITEM 00020 Dism./Inst.of comp.rad./conv.shock tube
5 Dismantling of existing radiation section and convection section shock tubes (bare tubes) installed at site and Installation of new supplied Complete radiation section tube assembly and convection section shock tubes (bare tubes) assembly of furnace 2112-F-01 at IOCL Gujarat Refinery site as per attached tender specifications Annexure-A Unit of measurement "1 EA" denotes charges for Dismantling of existing radiation section and convection section shock tubes (bare tubes) installed at site and Installation of new supplied Complete radiation section tube assembly and convection section shock tubes (bare tubes) assembly of furnace 2112-F-01 at IOCL Gujarat Refinery site as per attached tender specifications Annexure-A. (For Detailed SOR Description SOR Line Item - 00020-000010 at Page 37-38). 1.000 EA
6 Schedule of Rates ITEM 00030, 00040 and 00050:
7 OVER ALL QUOTE FOR THE ITEMS DESCRIBED IN SCHEDULE OF RATES ITEM 00030, 00040 and 00050 MENTIONED IN THE TECHNO-COMMERCIAL PART, PART-I (PAGE NO. 39-67). PLEASE READ QTY 14,05,422.15 AS TENDERED AMOUNT ON WHICH BIDDER IS REQUIRED TO QUOTE PERCENTAGE AS MENTIONED IN PREAMBLE TO SCHEDULE OF RATES CLAUSE 4. 1405422.150 SU
Tender InquiryInquiry