Emergency Work construction O, Noida - Tender Details
NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY
Noida, Uttar Pradesh, India
NTID 39820340
- Opening Date : Tue 8th April, 2025
- Closing Date : Mon 7th April, 2025
- ₹ 7560721.00
- NTID 39820340
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
179000.00 -
Document Cost
2832.00 -
Estimated Cost
7560721.00
BOQ Items Total Items : 64 | Total Qty : 31751
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line,water supply line,electric cable,telephone cable,gas pipe line etc,using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I.All kind of soil | 229.00 | Cum |
2 | Earth work in embankent in ordinary soil embankent to be in 20cm layer breaking clods.Watering,rolling each layer with 1/2tonne roller or wooden roller or steel rammer and rolling every third or top most layer with power roller or minimum 8 tonne including 1.5m lift and all lead including cartage of earth by mechanical transportation and all T&P labour etc,required for proper completion or work..(earth shall be arranged by the contractor at his own cost) | 121.50 | Cum |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 138.00 | Cum |
4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand(zone-III): 10 graded stone aggregate 20mm nominal size). | 50.00 | Cum |
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) | 12.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054