Development Of South Pavilion , Aurangabad-MH - Tender Details
Explore tender information for Development Of South Pavilion in Aurangabad-MH, including eligibility, deadlines, and bid specifics.
Municipal Corporation Aurangabad
Aurangabad-MH, Maharashtra, India
NTID 39434154
Opening Date : Thu 13th March, 2025
Closing Date : Tue 11th March, 2025
- ₹ 391679410.00
- NTID 39434154
Development Of South Pavilion And Approach Road Work (phase-i) Of International Cricket Stadium, Tennis Court, Basketball Court, Swimming Pool, Indoor Hall, Club, Hotel And Retails Stores At Chhatrapati Sambhajinagar
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1958397.00 -
Document Cost
5900.00 -
Estimated Cost
391679410.00
BOQ Items Total Items : 986 | Total Qty : 258077.39
# | Item | Quantity | Units |
---|---|---|---|
1 | Item No. 1 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means (SSR 22-23/Item No:21.02) | 0.00 | a |
2 | PART A- GR. FLOOR | 795.96 | Cubic Meter |
3 | Item No. 2 Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means (SSR 22-23/Item No:21.06) | 0.00 | a |
4 | PART A- GR. FLOOR | 634.95 | Cubic Meter |
5 | Item No. 3 Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means (SSR 22-23/Item No:21.08) | 0.00 | a |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054