- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Chennai Metropolitan Development Authority (CMDA)
- >
NTID 39824866
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Development Of Putheri Lake At, Chennai - Tender Details
Chennai Metropolitan Development Authority (CMDA)
Chennai, Tamil Nadu, India
NTID 39824866
- Opening Date : Wed 9th April, 2025
- Closing Date : Tue 8th April, 2025
- ₹ 0.00
- NTID 39824866
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
342000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 151 | Total Qty : 156418
# | Item | Quantity | Units |
---|---|---|---|
1 | A. CIVIL WORKS | ||
2 | Clearing scrub Jungle and Surface dressing of the ground. The rate including hire charges of all machineries, Removing of all rubbish, lead upto 50m , Transportation, and labour charges etc., complete complying with standard specification. | 6430.00 | SQM |
3 | Earth work excavation for all foundations in all type of soils and sub soils to the required depth for Footings, plinth / grade beams, etc,. by mechinaries including manual excavation for the following type of soil / rock as per detailed specification. As per SS 20B as hard rock requiring blasting inclusive of shoring strutting and baling out water wherever necessary and including refilling 0 to 2.0m depth consolidation depositing the surplus earth in places shown clearing and leveling the site with an initial lead of 10 metre and lifts as specified hereunder etc., complete in all respects complying with relevant standard specification and as directed by the departmental officers. | 800.00 | CUM |
4 | Supplying and laying of M. Sand & Gravel Mix in ratio 1:1 for each layer laying of 15 cm thick using 0.631 m3 of M.sand fo filling and 0.675 M3 of red gravel of 1m3 of volume including cost of sand gravel mix including labour charges for mixing , laying compaction all tools and planks employed etc., complete complying with standard specification and as directed by the departmental officers | 20.00 | CUM |
5 | Supplying and filling of Gravel / Good Earth by lorry in Foundation basement filling and site filling and Bund formation with approved materials excavation from approved quarries and compacted to meet requirement of table 300-1, 300-2 of MORTH, in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross-section including watering, spreading by Dozer, grading by motor grader and consolidation by vibratory road roller with desired field density not less than 95% of maximum dry density ,including all lead,lift, loading, unloading, all labour, hire charges of all machineries, Transportation, etc., complete in accordance with MORTH technical specification clause No. 305 and with all other incidental charges and as per the direction of the Engineer-In-Charge. | 4320.00 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054