ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Development And Maintenance Of, Kalpakkam - Tender Details
Explore tender information for Development And Maintenance Of in Kalpakkam, including eligibility, deadlines, and bid specifics.
INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH
Kalpakkam, Tamil Nadu, India
NTID 39389728
Opening Date : Tue 4th March, 2025
Closing Date : Mon 3rd March, 2025
- ₹ 9739000.00
- NTID 39389728
Development And Maintenance Of Lawn, Hedges, Flower Beds At Igcar North Side For The Year 2025-2026.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
194780.00 -
Document Cost
Refer Documents -
Estimated Cost
9739000.00
BOQ Items Total Items : 99 | Total Qty : 1323886
# | Item | Quantity | Units |
---|---|---|---|
1 | Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbages etc., collecting, conveying and disposing the same at places as shown by the department with a lead of 100 metres all complete as per specification and as directed by the Engineer-in-Charge. | 10000 | Sq.m. |
2 | Filling with selected excavated earth available at site upto a lead of 200m, filling in layer of not more than 150mm thickness, each layer well rammed and consolidated by hand/earth rammer including excavation of dumped earth, hire charges of rammer, water consolidation, levelling to proper gradient, dressing the top surface to the required level, complying with specification and all as directed by the Engineer-in-Charge. | 25 | Cu.m. |
3 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-Charge. | 100 | Cu.m. |
4 | Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 100 | Cu.m. |
5 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area (Non- sprinklers area) by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 20000 | Sq.m. |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054