Detailed Project Report Of Rea, Panchkula - Tender Details
Explore tender information for Detailed Project Report Of Rea in Panchkula, including eligibility, deadlines, and bid specifics.
Haryana Government
Panchkula, Haryana, India
NTID 39435446
Opening Date : Mon 3rd March, 2025
Closing Date : Mon 3rd March, 2025
- ₹ 49191089.00
- NTID 39435446
Detailed Project Report Of Realignment Of Pmda Water Pipeline From Kaushalya Dam Near Amravati Enclave Including Detailed Design Of Supporting Structure Within The Kaushalya River At Panchkula In The State Of Haryana.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
983900.00 -
Document Cost
5000.00 -
Estimated Cost
49191089.00
BOQ Items Total Items : 27 | Total Qty : 0
# | Item | Quantity | Units |
---|---|---|---|
1 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.1. Mechanical Means Depth up to 3 m [Through Rate] | $608.88 | cum |
2 | [15.1.2.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.2. Mechanical Means Depth 3 m to 6 m [Through Rate] | $1972.99 | cum |
3 | [15.45]Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications MORTandH clause 1600 [Through Rate] | $12.28 | per tonne |
4 | [15.8.1]Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical 1500, 1700 and 2000 of MORTandH Specifications. 1. PCC Grade M15 [Through Rate] | $76.39 | cum |
5 | [15.8.2]Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical 1500, 1700 and 2000 of MORTandH Specifications. 2. PCC Grade M20 [Through Rate] | $162.32 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054