CHENNAI METRO RAIL LIMITED
Chennai, Tamil Nadu, India
NTID 38739938
- Opening Date : Thu 30th January, 2025
- Closing Date : Wed 29th January, 2025
- ₹ 29400000.00
- NTID 38739938
Design, Supply, Fabrication And Installation Of Fixed Structural Glazing With Toughened Laminated Glass And Aluminium Louvers On The Side Openings For The Following Stations (wimco Nagar, Thiruvottiyur, Thiruvottiyur Theradi, Kaladipet, Tollgate, And New Washermenpet) For Cmrl Phase-i Extension Stations.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
293650.00 -
Document Cost
16000.00 -
Estimated Cost
29400000.00
BOQ Items Total Items : 2 | Total Qty : 1
# | Item | Quantity | Units |
---|---|---|---|
1 | NOTE: 1. Evaluation will be done by excluding the Provisional sum and GST Amount 2. GST is to be quoted rate of 18% 3. The bid price shall be net of Input Tax credit availed by the bidder i.e., base price shall not have any GST component in it. In effect, clause 171 of GST, that is, the Anti-Profiteering Rule shall be adhered to. A self-declaration from the bidder on clause 171, shall be attached with the invoice. The output GST paid by the bidder shall be reimbursed by CHENNAI METRO RAIL LIMITED on the production of the documentary evidence Preamble: 1) The Bill of Quantities should be read in conjunction with the conditions given in the General conditions of the contract and Special conditions of the contract and the rates should be quoted accordingly. 2) The quoted rate should be inclusive of all incidental and enabling charges such as scaffolding, man lift, ladder, roping System, lighting arrangements, etc., to carry out the works. No additional charge will be paid other than measurement. 3). Rates should be quoted considering the restricted working hours since the contractor shall be allowed to carry out the works only during the non-revenue hours if required. Works should be planned as per the block schedule finalized by the CMRL from time to time. 4) Quantities given in the Bill Of quantities are indicative only. All items shall be paid only against the actual quantities executed at site. 5) The Value of Variation is limited to +/- 25 %. 6) The Quoted rates should be inclusive of all design & drawing, supply fabrication and installation at site. Nothing shall be claimed extra in this regard. | ||
2 | SUMMARY OF PRICE BID | 1.00 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054