Facebook
Description

Design, Engineering, Development Of Waste To Art Park At Existing Art Park At Bhagwan Mahavir Balvihar Art Park At Campal, Panaji-goa

Tendering Authority: GOA WASTE MANAGEMENT CORPORATION

India, Goa, Panaji

NTID

29347352

Last Date For Submission

01 Nov, 2022

Closing Date

01 Nov, 2022

BOQ Items Total Items : 105 | Total Qty : 64602.27
# Item Quantity Units
1 Art Work
2 Providing miniatures / sculpture/structure of Pyramids of Gisa - The structure needs to be made with a minimum area, using the scrap/waste material available. Minimum Height - 16 feet. Minimum Width - 25 feet. Minimum length - 25 feet.Foundation Minimum height from ground level- 2 feet Minimum Width - 27 feet Minimum Length - 27 feet. Foundation Specs - including Brickwork all around the platform as a base for the platform on which installation shall be placed 4 Inches of PCC (1:3:6-1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) below the concrete slab RCC M-25 including steel (Tata/SAIL/JSW) with Vacuum Dewaterlng External Pavers / Stone Tiles on top of RCC SIab If required. The miniatures/sculpture shall be emboded in cement concrete In the ratio of 1:2:4 (1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) Including excavation and removal of surplus earth. For finishing while installation of miniatures/sculptures Applying primer coats (two or more) of approved quality primer, painting with P.U. Coating automotive paint finishing as per direction of work-in-charge, including all labour,maetrial, tools and plants all complete. 1.000 Nos
3 Providing miniatures / sculpture/structure of Leaning tower of Pisa - The structure needs to be made with a minimum area, using the scrap/waste material available. Minimum Height- 30 feet Minimum Width - 7.5 feet Minimum Length - 7.5 feet. Foundation Minimum Hight from Gound Level- 2 Feet Minimum Width -9.5 feet Minimum Length - 9.5 feet. Foundation Specs - including Brickwork all around the platform as a base for the platform on which installation shall be placed 4 Inches of PCC (1:3:6-1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) below the concrete slab RCC M-25 including steel (Tata/SAIL/JSW) with Vacuum Dewaterlng External Pavers / Stone Tiles on top of RCC SIab If required. The miniatures/sculpture shall be emboded in cement concrete In the ratio of 1:2:4 (1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) Including excavation and removal of surplus earth. For finishing while installation of miniatures/sculptures Applying primer coats (two or more) of approved quality primer, painting with P.U. Coating automotive paint finishing as per direction of work-in-charge, including all labour,maetrial, tools and plants all complete. 1.000 Nos
4 Providing miniatures / sculpture/structure of Pyramids of Gisa - The structure needs to be made with a minimum area, using the scrap/waste material available. Minimum Height - 16 feet. Minimum Width - 25 feet. Minimum length - 25 feet.Foundation Minimum height from ground level- 2 feet Minimum Width - 27 feet Minimum Length - 27 feet. Foundation Specs - including Brickwork all around the platform as a base for the platform on which installation shall be placed 4 Inches of PCC (1:3:6-1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) below the concrete slab RCC M-25 including steel (Tata/SAIL/JSW) with Vacuum Dewaterlng External Pavers / Stone Tiles on top of RCC SIab If required. The miniatures/sculpture shall be emboded in cement concrete In the ratio of 1:2:4 (1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) Including excavation and removal of surplus earth. For finishing while installation of miniatures/sculptures Applying primer coats (two or more) of approved quality primer, painting with P.U. Coating automotive paint finishing as per direction of work-in-charge, including all labour,maetrial, tools and plants all complete. 1.000 Nos
5 Providing miniatures/ sculpture/structure of Colosseum- The structure needs to be made with a minimum area, using the scrap/waste material available. Minimum Height - 16 feet. Minimum Width - 32 feet. Minimum Length - 45 feet. Foundation minimum from gorund level- 2 feet Minimum Width - 24 feet & Minimum Length - 47 feet. Foundation Specs - including Brickwork all around the platform as a base for the platform on which installation shall be placed 4 Inches of PCC (1:3:6-1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) below the concrete slab RCC M-25 including steel (Tata/SAIL/JSW) with Vacuum Dewaterlng External Pavers / Stone Tiles on top of RCC Slab if required. The miniatures/sculpture shall be emboded in cement concrete In the ratio of 1:2:4 (1cement: 2 coarse sand: 4 stone agg. 20mm nominal size) Including excavation and removal of surplus earth. For finishing while installation of miniatures/sculptures Applying primer coats (two or more) of approved quality primer, painting with P.U. Coating automotive paint finishing as per direction of work-in-charge, including all labour,maetrial, tools and plants all complete. 1.000 Nos
Tender InquiryInquiry