ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Repair And Renov, Kolkata - Tender Details
Explore tender information for Corrigendum Repair And Renov in Kolkata, including eligibility, deadlines, and bid specifics.
West Bengal State Warehousing Corporation
Kolkata, West Bengal, India
NTID 39291734
Opening Date : Mon 10th March, 2025
Closing Date : Sat 8th March, 2025
- ₹ 1047956.00
- NTID 39291734
Corrigendum : Repair And Renovation Work At Ridf Chanchal In The District Of Malda.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20959.00 -
Document Cost
Refer Documents -
Estimated Cost
1047956.00
BOQ Items Total Items : 50 | Total Qty : 1288.91
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete Depth of foundation upto 1500mm. For W-Bridge Room | 13.500 | CUM |
2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand | 2.810 | CUM |
3 | Earth work & filling in foundation trences or plinth with good earth in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete.(Payment to be made on basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. 2/3 volume of cutting quantity | 9.000 | CUM |
4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand | 79.910 | SQM |
5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches | 85.810 | SQM |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054