- Closing Date : Sat 18th January, 2025
- ₹ 1387590.00
- NTID 38810804
Corrigendum : Renovation Of Well At Chasole-chasole Kh. Tal.murbad Dist.thane
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
13900.00 -
Document Cost
500.00 -
Estimated Cost
1387590.00
BOQ Items Total Items : 22 | Total Qty : 2227.491
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismentlingthe existing structure/ Removing lime or lean cement concrete including stacking the spoils as directed with alll eads, liftsetc, complete. | 25.690 | Cum |
2 | Excavation for foundation in earth soil of all types, sand, gravel & soft murum including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete. a) Lift 0 to 1.50 M. | 124.570 | Cum |
3 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete. a) Lift 1.50 to 3.00 M | 111.910 | Cum |
4 | Excavation for foundation in hard murum with boulders including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete. a) Lift 3.00 to 4.50 M | 99.840 | Cum |
5 | Excavation for foundation in soft rock old lime masonary foundation including trimming & leveling the bed by chiselling where necessary & removing the excavated material & stacking it in measurable heaps within a distance of 50 m from the area & lifts as below, normal dewatering, excluding the backfilling etc complete. a) Lift 4.50 to 6.00 M | 56.520 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054