ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Jal Jeevan Missi, Malappuram - Tender Details
Explore tender information for Corrigendum Jal Jeevan Missi in Malappuram, including eligibility, deadlines, and bid specifics.
Kerala Rural Water Supply and Sanitation Agency
Malappuram, Kerala, India
NTID 39090080
Opening Date : Wed 5th March, 2025
Closing Date : Tue 4th March, 2025
- ₹ 39828476.00
- NTID 39090080
Corrigendum : Jal Jeevan Mission - Package 7a - Full Coverage To Odakkayam Ward 2 In Urangattiri Gramapanchayath, Malappuram District
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
7500.00 -
Estimated Cost
39828476.00
BOQ Items Total Items : 90 | Total Qty : 275378.845
# | Item | Quantity | Units |
---|---|---|---|
1 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 0.634 | m3 |
2 | Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 119.940 | m2 |
3 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 120.000 | kg |
4 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor Vlevel with RCC band at sill level and lintel level with approved block laying polymermodified adhesive mortar all complete as per direction of Engineer-in Charge. (Thepayment of RCC band and reinforcement shall be made for seperately). | 1.796 | m3 |
5 | White washing with lime to give an even shade:New work (three or more coats) | 25.380 | m2 |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054