Corrigendum Construction Wor, Pithoragarh - Tender Details
Explore tender information for Corrigendum Construction Wor in Pithoragarh, including eligibility, deadlines, and bid specifics.
MD Uttarakhand Agriculture Produce Marketing Board Rudrapur
Pithoragarh, Uttarakhand, India
NTID 39259532
Opening Date : Tue 4th March, 2025
Closing Date : Tue 4th March, 2025
- ₹ 9770000.00
- NTID 39259532
Corrigendum : Construction Work Of Sports Ground In Dungri, Pithoragarh
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
195000.00 -
Document Cost
4720.00 -
Estimated Cost
9770000.00
BOQ Items Total Items : 14 | Total Qty : 17662.61
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302. | 7987.500 | Cum |
2 | Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and crosssections as per Technical Specification Clause 302.3. | 7021.500 | Cum |
3 | Excavation in Hard Rock (with Credit for useful Mateial Received) 3-9-A-1 Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302. | 1101.000 | Cum |
4 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material., | 327.500 | Cum |
5 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203, | 48.000 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054