- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Highways Department
- >
NTID 39503611
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Construction Of , Coimbatore - Tender Details
Highways Department
Coimbatore, Tamil Nadu, India
NTID 39503611
- Opening Date : Thu 3rd April, 2025
- Closing Date : Wed 2nd April, 2025
- ₹ 208000000.00
- NTID 39503611
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1050000.00 -
Document Cost
Refer Documents -
Estimated Cost
208000000.00
BOQ Items Total Items : 97 | Total Qty : 984645.77
# | Item | Quantity | Units |
---|---|---|---|
1 | Forming embankment with value not less than including cost of excavation and conveyance to site spreading in layers of thickness not exceeding 200mm compacted thickness, sectioning, ramming and watering and compacting by power roller in the required proctor density at 97% compaction for the top 500mm thick compaction of the sub grade and compacting the compaction below 500mm thick to 97% of the maximum dry density of the materials, including watering with all leads for water and compaction by power roller and finishing be surface to the required transverse and longitudinal camber profile and including all other incidental charges, labour charges complete including hire and machinary charges for power roller, water sprinkler in all other tools and plant involves etc., complete for Sub grade For Service Road and Approach Road. | ||
2 | (i) For Service Road | 3799.00 | Cubic Metre |
3 | (ii) For Approach Road | 662.00 | Cubic Metre |
4 | Forming embankment with value not less than including cost of excavation and conveyance to site spreading in layers of thickness not exceeding 200mm compacted thickness, sectioning, ramming and watering and compacting by power roller in the required proctor density at 95% compaction for the top 500mm thick compaction of the sub grade and compacting the compaction below 500mm thick to 95% of the maximum dry density of the materials, including watering with all leads for water and compaction by power roller and finishing be surface to the required transverse and longitudinal camber profile and including all other incidental charges, labour charges complete including hire and machinary charges for power roller, water sprinkler in all other tools and plant involves etc., complete for Sub grade For Approach Road. | ||
5 | (ii) For Approach Road | 1968.00 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054