ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of , DEHRADUN - Tender Details
Explore tender information for Corrigendum Construction Of in DEHRADUN, including eligibility, deadlines, and bid specifics.
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation of Uttarakhand Limited
DEHRADUN, Uttarakhand, India
NTID 38728976
- Opening Date : Thu 30th January, 2025
- Closing Date : Thu 30th January, 2025
- ₹ 85168000.00
- NTID 38728976
Corrigendum : Construction Of Proposed Academic Block For Govt Degree College Bahadarpur Jatt, Haridwar
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1703000.00 -
Document Cost
5900.00 -
Estimated Cost
85168000.00
BOQ Items Total Items : 197 | Total Qty : 280414.6
# | Item | Quantity | Units |
---|---|---|---|
1 | EARTH WORK | ||
2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1693.50 | cum |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1067.80 | cum |
4 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 966.20 | cum |
5 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 25km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation, road and terrace filling etc. for all lift complete in all respect. | 3878.90 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054